Tripp Lite 9PX11KPM Eaton 9PX 8000 9PX 11000 9PX EBM 240V Installation and Use - Page 23
Installation depending on the system earthing arrangement SEA
View all Tripp Lite 9PX11KPM manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
ENGLISH 3. Installation 3.9 Installation depending on the system earthing arrangement (SEA) • UPS with common Normal and Bypass AC inputs Main low voltage switchboard (MLVS) Bypass AC 11 10 8 Normal AC Load Change in SEA between upstream and downstream or galvanic isolation required Main low voltage switchboard (MLVS) Bypass AC 11 Isolation transformer 10 8 Normal AC Load • UPS with separate Normal and Bypass AC inputs Main low voltage switchboard (MLVS) Bypass AC 11 Isolation transformer 10 8 Normal AC Load Change in SEA between upstream and downstream or galvanic isolation required Main low voltage switchboard (MLVS) Bypass AC 11 Isolation transformer Isolation transformer 10 8 Normal AC Load The transformer is not necessary if: • Normal and Bypass inputs are connected to the same source, * • and wires cross-sections and lengths of Normal and Bypass inputs are identical, • and upstream protection is provided by only one switch with RCD (Residual Current Device) for Normal and Bypass AC inputs. 8-11kVA US_EN Page 23