Weider 8700 I English Manual - Page 15

Route the Low Cable 53 under a Thick

Page 15 highlights

21. Route the Low Cable (53) through the Upright (3) and under a Thick Pulley (48). 21 Attach the Thick Pulley (48) inside the Upright (3) with an M10 x 46mm Bolt (81) and an M10 Locknut (56). 3 56 53 48 81 22. Route the Low Cable (53) over a Thick Pulley (48). 22 Attach the Thick Pulley (48) and two Half Guards (43) to the Double U-bracket (63) with an M10 x 46mm Bolt (81) and an M10 Locknut (56). Make sure that the Half Guards are on the outside of the Double U-bracket as shown. 43 56 53 63 43 48 81 23. Route the Low Cable (53) under a Thick Pulley (48). 23 Attach the Thick Pulley (48) and two Half Guards (43) to the Base (1) with an M10 x 46mm Bolt (81) and an M10 Locknut (56). Make sure that the Half Guards are on the outside of the bracket as shown. 56 43 53 48 1 43 81 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

15
21. Route the Low Cable (53) through the Upright
(3) and under a Thick Pulley (48).
Attach the Thick Pulley (48) inside the Upright
(3) with an M10 x 46mm Bolt (81) and an M10
Locknut (56).
22. Route the Low Cable (53) over a Thick
Pulley (48).
Attach the Thick Pulley (48) and two Half Guards
(43) to the Double U-bracket (63) with an M10 x
46mm Bolt (81) and an M10 Locknut (56).
Make
sure that the Half Guards are on the outside
of the Double U-bracket as shown.
21
56
22
48
81
81
3
23. Route the Low Cable (53) under a Thick
Pulley (48).
Attach the Thick Pulley (48) and two Half Guards
(43) to the Base (1) with an M10 x 46mm Bolt
(81) and an M10 Locknut (56).
Make sure that
the Half Guards are on the outside of the
bracket as shown.
23
43
1
43
81
56
48
63
43
43
53
48
56
53
53