Weider Weevsy30810 English Manual - Page 13

Attach the Thick Pulley 48 and two Half Guards

Page 13 highlights

15. Identify the two V-pulleys (46), the nine Thick Pulleys (not shown), and the two Thin Pulleys 15 (not shown). Route the Arm Cable (54) over a V-pulley (46). Attach the V-pulley (46), a Large Cable Trap (50), two Full Guards (41), and an M10 Washer (57) to the Upright (3) with an M10 x 63mm Bolt (75) and an M10 Locknut (56). Make sure that the Large Cable Trap (50) is oriented to hold the Arm Cable (54) in the groove of the V-pulley (46). 3 41 57 46 50 41 75 56 54 16. Route the Arm Cable (54) around a Thick Pulley (48). 16 Attach the Thick Pulley (48) and two Half Guards (43) to the Double U-bracket (63) with an M10 x 46mm Bolt (81) and an M10 Locknut (56). Make sure that the Half Guards are on the outside of the Double U-bracket as shown. 54 43 81 48 56 43 63 17. Route the Arm Cable (54) over a V-pulley (46). 17 Attach the V-pulley (46), a Large Cable Trap (50), two Full Guards (41), and an M10 Washer (57) to the Upright (3) with an M10 x 63mm Bolt (75) and an M10 Locknut (56). Make sure that the Large Cable Trap (50) is oriented to hold the Arm Cable (54) in the groove of the V-pulley (46). 75 41 50 46 54 57 41 3 56 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

13
15. Identify the two V-pulleys (46), the nine Thick
Pulleys (not shown), and the two Thin Pulleys
(not shown).
Route the Arm Cable (54) over a V-pulley (46).
Attach the V-pulley (46), a Large Cable Trap
(50), two Full Guards (41), and an M10 Washer
(57) to the Upright (3) with an M10 x 63mm Bolt
(75) and an M10 Locknut (56).
Make sure that the Large Cable Trap (50) is
oriented to hold the Arm Cable (54) in the
groove of the V-pulley (46).
56
3
57
46
50
41
75
54
41
15
16. Route the Arm Cable (54) around a Thick
Pulley (48).
Attach the Thick Pulley (48) and two Half Guards
(43) to the Double U-bracket (63) with an M10 x
46mm Bolt (81) and an M10 Locknut (56).
Make
sure that the Half Guards are on the outside
of the Double U-bracket as shown.
48
43
43
63
56
54
16
17
56
3
57
46
50
75
54
41
81
41
17. Route the Arm Cable (54) over a V-pulley (46).
Attach the V-pulley (46), a Large Cable Trap
(50), two Full Guards (41), and an M10 Washer
(57) to the Upright (3) with an M10 x 63mm Bolt
(75) and an M10 Locknut (56).
Make sure that the Large Cable Trap (50) is
oriented to hold the Arm Cable (54) in the
groove of the V-pulley (46).