Weslo Cadence 2300 English Manual - Page 4
Assembly
View all Weslo Cadence 2300 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
ASSEMBLY Remove all parts from the packing carton. Make sure that all parts are included before disposing of the packing materials. Read each step carefully before beginning. Assembly can be completed using a standard screwdriver (not included). 1. Raise the Upright Post (19) to a vertical position. Insert the Lock Knob (24), with the Lock Knob Washer (23), into the Upright Post. and turn the Knob clockwise until 19 almost tight. Leave a little play in the Upright Post for the following steps. 24 23 2. Slide the upper end of the Side Rail (6) into the opening in the left side of the Console (9). Insert the Short Side Rail Bolt (18) through the metal plate under the Console, and tighten.the Bolt into the Side Rail. Note: if the Side Rail cannot be inserted into the Console far enough to attach the Bolt, roll back the Side Foam Grip (7) slightly. 3. Align the hole in the lower end of the Side Rail (6) with the hole in the Frame (48). Attach the Side Rail with the Long Side Rail Bolt (4), Formed Washer (3) and the Side Rail Washer (2). Tighten the Lock Knob (See step 1).. 7 18 6 9 6 2 3