Whirlpool WGD6400SB Use and Care Manual - Page 10

SeeDetermine

Page 10 highlights

Ventsystemchart NOTEP: erformanocferearexhaustot eithesrideofthedryeris equivaletnotaddingoneelbowT. odeterminmeaximumexhaust lengtha,ddoneelbowtothechart. Examine the leveling legs. Find the diamond marking. Numbeorf 90° turns orelbows 0 1 Typeof vent Boxor Angled Louvered hoods hoods Rigidmetal 64ft (20m) 58ft (17,7m) Flexiblemetal 36ft (11m) 28ft (8,5m) Rigidmetal 54ft (16.5m) 48ft (14.6m) Flexiblemetal 31ft (9.4m) 23ft (7m) 4. Screw the legs into the leg holes by hand. Use a wrench to finish turning the legs until the diamond marking is no longer visible. 5. Place a carton corner post from dryer packaging under each of the 2 dryer back corners. Stand the dryer up. Slide the dryer on the corner posts until it is close to its final location. Leave enough room to connect the exhaust vent or gas line. 2 Rigidmetal 44ft (13.4m) 38ft (11,6m) For mobile home use Flexiblemetal 27ft (8,2m) 19ft (5,8m) Gas dryers must be securely fastened to the floor. 3 Rigidmetal 35ft (10.7m) 29ft (8.8m) Flexiblemetal 25ft (7,6m) 17ft (5,2m) 4 Rigidmetal 27ft (8,2m) 21ft (6,4m) Flexiblemetal 23ft (7m) 15ft (4,6m) 1. Instaell xhaushtoodU. secaulkincgompountodseael xterior wallopeninagroundexhaushtood. 2. ConnecvtentoexhaushtoodV. enmt usftitinsideexhaust hoodS. ecurveentoexhaushtoodwith4"(10.2cm)clamp. 3. RunventodryelrocationU.sethestraightepsat thpossible. See"Determinventpath"in"PlanVenSt ystemA."void90° turnsU. seclamptsoseaal lljointsD. onotuseductape, screwosrothefrastenindgevicetshatextendintotheinterior ofthevent o securveent. Mobile home installations require a Mobile Home Installation Kit. See "Tools and Parts" section for information on ordering. 1, Remove the red cap from the gas pipe. 2. Using a wrench to tighten, connect the gas supply to the dryer. Use pipe-joint compound on the threads of all nonflared male fittings. If flexible metal tubing is used, be sure there are no kinks. Excessive Weight Hazard Use two or more people to move and install dryer. Failure to do so can result in back or other injury. 1. To protect the floor, use a large flat piece of cardboard from the dryer carton. Place cardboard under the entire back edge of the dryer. 2. Firmly grasp the body of the dryer (not the top or console panel). Gently lay the dryer on the cardboard. See illustration. A _ B.......... A. Flared male thread B. Non-flared male thread NOTE: For LP gas connections, you must use pipe-joint compound resistant to the action of LP gas. Do not use TEFLON _t tape. t®TEFLON is a registered trademark of E.I. Du Pont De Nemours and Company• 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72

Ventsystemchart
NOTE:
Performance
ofrearexhaust
toeither
sideofthedryer
is
equivalent
toaddingoneelbow.
Todetermine
maximum
exhaust
length,
addoneelbow
tothechart.
Number
of
Typeof
Boxor
Angled
90°turns
vent
Louvered
hoods
orelbows
hoods
0
Rigidmetal
64ft(20m)
58ft(17,7m)
Flexiblemetal
36ft(11m)
28ft(8,5m)
1
Rigidmetal
54ft(16.5m)
48ft(14.6m)
Flexiblemetal
31ft(9.4m)
23ft(7m)
2
Rigidmetal
44ft(13.4m)
38ft(11,6m)
Flexiblemetal
27ft(8,2m)
19ft(5,8m)
3
Rigidmetal
35ft(10.7m)
29ft(8.8m)
Flexiblemetal
25ft(7,6m)
17ft(5,2m)
4
Rigidmetal
27ft(8,2m)
21ft(6,4m)
Flexiblemetal
23ft(7m)
15ft(4,6m)
1. Install
exhaust
hood.
Usecaulking
compound
toseal
exterior
wall
opening
aroundexhaust
hood.
2. Connect
ventoexhaust
hood.
Vent
must
fitinsideexhaust
hood.
Secure
ventoexhaust
hoodwith4"(10.2cm)clamp.
3. Runventodryer
location.
Use
thestraightest
pathpossible.
See"Determine
ventpath"in"PlanVent
System."
Avoid90°
turns.
Useclamps
toseal
alljoints.
Donotuseductape,
screws
orother
fastening
devices
thatextend
intotheinterior
oftheventosecure
vent.
Excessive
Weight
Hazard
Use two or more people to move and install
dryer.
Failure to do so can result in back or other injury.
1.
To protect the floor, use a large flat piece
of cardboard
from
the dryer carton.
Place cardboard
under the entire back edge
of the dryer.
2.
Firmly grasp the body of the dryer (not the top
or console
panel). Gently
lay the dryer on the cardboard.
See illustration.
Examine
the leveling
legs. Find the diamond
marking.
4.
Screw the legs into the leg holes by hand.
Use a wrench to
finish turning
the legs until the diamond
marking
is no longer
visible.
5.
Place a carton corner
post from dryer packaging
under each
of the 2 dryer back corners.
Stand the dryer up. Slide the
dryer on the corner
posts until it is close to its final location.
Leave enough
room to connect
the exhaust
vent or gas line.
For mobile
home use
Gas dryers must be securely
fastened
to the floor.
Mobile
home installations
require a Mobile
Home Installation
Kit.
See "Tools and Parts" section for information
on ordering.
1,
2.
Remove the red cap from the gas pipe.
Using a wrench to tighten,
connect
the gas supply
to the
dryer. Use pipe-joint
compound
on the threads
of all non-
flared male fittings.
If flexible
metal tubing
is used, be sure
there are no kinks.
A
............................
_
_
........................
B
A. Flared
male thread
B. Non-flared
male thread
NOTE: For LP gas connections,
you must use pipe-joint
compound
resistant to the action of LP gas. Do not use
TEFLON _t tape.
t®TEFLON
is a registered
trademark
of E.I. Du Pont De Nemours
and Company•
10