3Ware 9500S-12MI Installation Guide - Page 110
Installation Instructions, controller and set the bracket aside.
UPC - 693494951219
View all 3Ware 9500S-12MI manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 110 highlights
Appendix A. Installing the Battery Backup Unit Installation Instructions 1 For full-height controllers, turn the controller memory-side down on a flat surface. 2 Remove the screws that connect the PCI bracket to the controller and set the bracket aside. Half-height board: bracket unscrews from top side of board. Full-height board: bracket unscrews from bottom side of board. Figure 4. Removing the screws from the PCI bracket 3 For full-height controllers, turn the controller memory side up. 102 3ware 9000 Series Serial ATA RAID Controller Installation Guide
Appendix A. Installing the Battery Backup Unit
102
3ware 9000 Series Serial ATA RAID Controller Installation Guide
Installation Instructions
1
For full-height controllers, turn the controller memory-side
down on a flat surface.
2
Remove the screws that connect the PCI bracket to the
controller and set the bracket aside.
Figure 4.
Removing the screws from the PCI bracket
3
For full-height controllers, turn the controller memory side up.
Half-height board:
bracket unscrews from
top side of board.
Full-height board: bracket
unscrews from bottom side of
board.