Antec Three Hundred Two Manual - Page 13
Internal 3, Device Installation, Cable Management - drive rails
View all Antec Three Hundred Two manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
2.8 Internal 3.5" Device Installation The Three Hundred Two includes 6 pairs of 3.5" drive rails. You will need 1 pair per 3.5" drive. 1. Line up the drive rail pins to the sides of your 3.5" drive. Ensure that the squeeze-tabs are aligned on the side of your drive that does not have power or data connectors. 2. Snap the rail into place. 3. Repeat steps 1-2 for the other side of the 3.5" drive. 4. Pinch the ends of the drive rails together and slide the drive into the 3.5" bay until it locks into position. This is the drive rail pin that is inserted into your 3.5" drive hole Pinch the ends of the drive rails and then slide your drive into the 3.5" bay until it locks into position. 2.9 Cable Management There is a cable management compartment between the motherboard and right side panel. You can tuck excess cables in this compartment or route them to the drive bays through one of the four conveniently-placed cable management holes. Choose the cables you would like to pass through the holes behind the motherboard tray. Pull them through the hole toward the right side of the case. Feed the cables back through the insertion point nearest the destination of the cable. 13