Biostar TFORCE 6100 TForce 6100 user's manual - Page 6
Hardware Installations - manual
View all Biostar TFORCE 6100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Biostar T-Series Chapter 2: Hardware Installations 2.1 CPU ASSEMBLY A. Central Processing Unit (CPU) for Socket 939 Step 1: Remove the socket protection cap. Step 2: Pull the socket locking lever out from the socket and then raise the lever up to a 90-degree angle. Step 3: Look for the triangular cut edge on socket, and the golden dot on CPU should point towards this triangular cut edge. The CPU will fit only in the correct orientation. TForce 6100-939/ TForce 6100 Step 5: Put the CPU Fan and heatsink assembly on the CPU and buckle it on the retention frame. Connect the CPU FAN power cable into the JCFAN1. This completes the installation. B. Central Processing Unit (CPU) for Socket 754 Step 1: Pull the socket locking lever out from the socket and then raise the lever up to a 90-degree angle. 90 A Step 2: Look for the triangular cut edge on socket, and the white dot on CPU should point towards this triangular cut edge. The CPU will fit only in the correct orientation. Step 3: Hold the CPU down firmly, and then lower the lever to locked position to complete the installation. Step 4: Hold the CPU down firmly, and then lower the lever to locked position to complete the installation. Step 4: Put the CPU Fan and heatsink assembly on the CPU and buckle it on the retention frame. Connect the CPU FAN power cable into the JCFAN1. This completes the installation. 1 User's Manual