Bosch DVR16E2302 Installation Instructions - Page 11

On-screen help, Unpacking, Package contents, Installation environment - specifications

Page 11 highlights

Divar | Installation Manual | Introduction EN | 1-3 On-screen help On-screen context-sensitive help is available for all topics. Just press the yellow ALT key for at least one second to see the help text associated with your current activity. Press the escape key to exit help. For more information please visit: www.boschsecuritysystems.com Unpacking Check the package for visible damage. If any items appear to have been damaged in shipment, notify the shipping company. Unpack carefully. This is electronic equipment and should be handled with care to prevent damage to the unit. Do not attempt to use the unit if any components are damaged. If any items are missing, notify your Customer Service Representative or Bosch Security Systems Sales Representative. The shipping carton is the safest container in which to transport the unit. Save it and all packing materials for future use. If the unit must be returned, use the original packing materials. Package contents Check for the following items: • Digital Video Recorder (Divar 16, Divar 9 or Divar 6 unit) • Quick reference guide • Divar operation manual • Divar Control Center and Archive Player operation manual • Installation manual (this manual) • A 25-pin D-type connector board with screw terminals (used for switching and alarm connections) • A 15-pin D-type connector board with screw terminals (used for PTZ connections) • Power supply cord • Network cross-over cable • Serial RS232 cross-over (null-modem) cable • Divar loop-through cable • Rack mounting kit • A CD-ROM with the software and the manuals. • SCSI terminator** (mounted on the SCSI connector; do not remove unless an external SCSI device is to be connected). Installation environment Mounting: The Divar is supplied as a desktop unit. If desired, the unit may be rack mounted using the rack mounting kit supplied with the unit. Ventilation: Ensure that the location planned for the installation of the unit is well ventilated. Take note of the locations of the cooling vents in the unit's enclosure and ensure that they are not obstructed. Temperature: Observe the unit's ambient temperature specifications when choosing an installation space. Extremes of heat or cold beyond the specified operating temperature limits may cause the unit to fail. Do not install the unit on top of hot equipment. Power Supply: Ensure that the site's AC power supply is stable and within the rated voltage of the unit. If the site's AC power is likely to have spikes or power dips, use power line conditioning or an uninterruptable power supply (UPS). Bosch Security Systems

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

Bosch Security Systems
Divar
| Installation Manual | Introduction
EN
| 1-3
On-screen help
On-screen context-sensitive help is available for all topics. Just press the yellow
ALT key
for at least one second to see the help text associated with your
current activity. Press the escape key
to exit help.
For more information please visit:
www.boschsecuritysystems.com
Unpacking
Check the package for visible damage. If any items appear to have been
damaged in shipment, notify the shipping company. Unpack carefully. This is
electronic equipment and should be handled with care to prevent damage to the
unit. Do not attempt to use the unit if any components are damaged. If any
items are missing, notify your Customer Service Representative or Bosch
Security Systems Sales Representative.
The shipping carton is the safest container in which to transport the unit. Save it
and all packing materials for future use. If the unit must be returned, use the
original packing materials.
Package contents
Check for the following items:
Digital Video Recorder (Divar 16, Divar 9 or Divar 6 unit)
Quick reference guide
Divar operation manual
Divar Control Center and Archive Player operation manual
Installation manual (this manual)
A 25-pin D-type connector board with screw terminals (used for switching
and alarm connections)
A 15-pin D-type connector board with screw terminals (used for PTZ
connections)
Power supply cord
Network cross-over cable
Serial RS232 cross-over (null-modem) cable
Divar loop-through cable
Rack mounting kit
A CD-ROM with the software and the manuals.
SCSI terminator** (mounted on the SCSI connector; do not remove unless
an external SCSI device is to be connected).
Installation environment
Mounting:
The Divar is supplied as a desktop unit. If desired, the unit may be
rack mounted using the rack mounting kit supplied with the unit.
Ventilation:
Ensure that the location planned for the installation of the unit is
well ventilated. Take note of the locations of the cooling vents in the unit's
enclosure and ensure that they are not obstructed.
Temperature:
Observe the unit's ambient temperature specifications when
choosing an installation space. Extremes of heat or cold beyond the specified
operating temperature limits may cause the unit to fail. Do not install the unit on
top of hot equipment.
Power Supply:
Ensure that the site's AC power supply is stable and within the
rated voltage of the unit. If the site's AC power is likely to have spikes or power
dips, use power line conditioning or an uninterruptable power supply (UPS).