Bosch WTMC533SUS Operating, Care, Installation - Page 7

Notice, Warning - tools

Page 7 highlights

Useful Tools The following tools are helpful during installation: 1. T20 star head screwdriver 2. Philips screwdriver (#2) 3. Flat blade screwdriver 4. Open end wrench 1 in. (25mm) 5. Bubble level Checklist for Installation 1. Unpack the dryer. 2. Remove all objects from the drum. 3. Check the dryer for visible damage. 4. Position the dryer near the installation location (see page 7). 5. If required, change the door hinge to the left (see page 15). 6. If required, install the side or bottom exhaust air outlet on the dryer (see page 15). 7. Have the power supply cord fitted by a qualified technician or a licensed electrician (see page 9). 8. Check for Y" connection, short hose and AQUASTOP® Hose included with the dryer packaging (see page 8). 9. Connect the water supply to the back of the dryer (see page 8 for detailed instructions). 10. Install exhaust ductwork if necessary. Follow the installation instructions supplied by the appropriate ductwork parts manufacturers (see page 14) i If space is very restricted, it is recommended to fit the initial parts of the exhaust duct to the dryer before the dryer is moved to its final installation location. 11. Move the dryer to its final location. NOTICE Do not slide dryer across the floor if heightĆadjustable feet have been extended. Feet and/or dryer base may be damaged if dryer is slid across floor with heightĆadjustable feet extended. 12. Position and then level the dryer. The dryer should be level with all four feet firmly on the ground. The dryer must not wobble. If the dryer is not level or if it does wobble, the feet must be adjusted. Adjust the heightĆadjustable feet until the dryer does not rock and is level, both frontĆtoĆback and sideĆtoĆside. q After making preliminary adjustments, press down on each corner of the dryer to make sure the unit does not wobble. If it does wobble, lower the foot on that corner until the foot touches the floor firmly. Install the dryer and level side to side and front to back. Use a bubble level. Never remove the heightĆadjustable feet! 13. Connect the exhaust duct to the exhaust air outlet on the dryer (see page 13). 14. Insert the dryer electrical plug into the wall receptacle (see page 9). 15. Read the operating instructions to understand how your dryer operates. (see page 16). 16. Conduct an appliance test: q Check that the drum is empty. q Close the dryer door. q Switch the dryer to "Extra Dry" and then press the Start" button. q After 3-5 minutes press the Stop button and open the door. q If the interior of the dryer feels warm, the dryer has been connected properly. Switch the dryer to "OFF". q If the dryer does not work, switch the dryer to "OFF". Look in the troubleshooting section (page 25) and find the fault. Installation location d WARNING DO NOT install the dryer: - outdoors - in an environment with dripping water, - near flammable materials, - in rooms which are at risk of frost, - in rooms which may contain gas or other fuels, - in cupboards with lockable doors or in alcoves. The installation room must be well ventilated, otherwise the dryer will operate below optimum performance. Do not operate the dryer at temperatures above 104°F (40°C) or below 41°F (5°C). Low temperatures affect the automatic program sequence and may prolong the drying times. The installation surface for the dryer must be clean, level and firm. Do not install the appliance on carpets! Compensate for uneven floors with the heightĆadjustable feet. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64

7
Useful
Tools
The
following
tools
are
helpful
during
installation:
1.
T20
star
head
screwdriver
2.
Philips
screwdriver
(#2)
3.
Flat
blade
screwdriver
4.
Open
end
wrench
1
in.
(25mm)
5.
Bubble
level
Checklist
for
Installation
1.
Unpack
the
dryer.
2.
Remove
all
objects
from
the
drum.
3.
Check
the
dryer
for
visible
damage.
4.
Position
the
dryer
near
the
installation
location
(see±page±7).
5.
If
required,
change
the
door
hinge
to
the
left
(see±page±15).
6.
If
required,
install
the
side
or
bottom
exhaust
air
outlet
on
the
dryer
(see
page±15).
7.
Have
the
power
supply
cord
fitted
by
a
qualified
technician
or
a
licensed
electrician
(see
page
9).
8.
Check
for
²Y"
connection,
short
hose
and
AQUASTOP
Hose
included
with
the
dryer
packaging
(see
page
8).
9.
Connect
the
water
supply
to
the
back
of
the
dryer
(see
page
8
for
detailed
instructions).
10.
Install
exhaust
ductwork
if
necessary.
Follow
the
installation
instructions
supplied
by
the
appropriate
ductwork
parts
manufacturers
(see
page
14)
i
If
space
is
very
restricted,
it
is
recommended
to
fit
the
initial
parts
of
the
exhaust
duct
to
the
dryer
before
the
dryer
is
moved
to
its
final
installation
location.
11.
Move
the
dryer
to
its
final
location.
NOTICE
Do
not
slide
dryer
across
the
floor
if
heightĆadjustable
feet
have
been
extended.
Feet
and/or
dryer
base
may
be
damaged
if
dryer
is
slid
across
floor
with
heightĆadjustable
feet
extended.
12.
Position
and
then
level
the
dryer.
The
dryer
should
be
level
with
all
four
feet
firmly
on
the
ground.
The
dryer
must
not
wobble.
If±the
dryer
is
not
level
or
if
it
does
wobble,
the
feet
must
be
adjusted.
Adjust
the
heightĆadjustable
feet
until
the
dryer
does
not
rock
and
is
level,
both
frontĆtoĆback
and
sideĆtoĆside.
q
After
making
preliminary
adjustments,
press
down
on
each
corner
of
the
dryer
to
make
sure
the
unit
does
not
wobble.
If
it
does
wobble,
lower
the
foot
on
that
corner
until
the
foot
touches
the
floor
firmly.
Install
the
dryer
and
level
side
to
side
and
front
to
back.
Use
a
bubble
level.
Never
remove
the
heightĆadjustable
feet!
13.
Connect
the
exhaust
duct
to
the
exhaust
air
outlet
on
the
dryer
(see
page
13).
14.
Insert
the
dryer
electrical
plug
into
the
wall
receptacle
(see
page
9).
15.
Read
the
operating
instructions
to
understand
how
your
dryer
operates.
(see
page
16).
16.
Conduct
an
appliance
test:
q
Check
that
the
drum
is
empty.
q
Close
the
dryer
door.
q
Switch
the
dryer
to
"Extra
Dry"
and
then
press
the
²Start"
button.
q
After
3-5
minutes
press
the
Stop
button
and
open
the
door.
q
If
the
interior
of
the
dryer
feels
warm,
the
dryer
has
been
connected
properly.
Switch
the
dryer
to
"OFF".
q
If
the
dryer
does
not
work,
switch
the
dryer
to
"OFF".
Look
in
the
troubleshooting
section
(page
25)
and
find
the
fault.
Installation
location
d
WARNING
DO
NOT
install
the
dryer:
-
outdoors
-
in
an
environment
with
dripping
water,
-
near
flammable
materials,
-
in
rooms
which
are
at
risk
of
frost,
-
in
rooms
which
may
contain
gas
or
other
fuels,
-
in
cupboards
with
lockable
doors
or
in
alcoves.
The
installation
room
must
be
well
ventilated,
otherwise
the
dryer
will
operate
below
optimum
performance.
Do
not
operate
the
dryer
at
temperatures
above
104
°
F
(40
°
C)
or
below
41
°
F
(5
°
C).
Low
temperatures
affect
the
automatic
program
sequence
and
may
prolong
the
drying
times.
The
installation
surface
for
the
dryer
must
be
clean,
level
and
firm.
Do
not
install
the
appliance
on
carpets!
Compensate
for
uneven
floors
with
the
heightĆadjustable
feet.