Brother International BE-1206B Maintenance Schedule - English - Page 7

Attach the head front covers R [9].

Page 7 highlights

BE-1204, 1206 For Technical Assistance Please Call Toll Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx Monthly Maintenance Greasing Cam grooves continued 11. Move the needle bar case to the needle bar No.1 15. Install left end head cover. position by rotating the color change knob. 16. Install right end head cover. 12. Unscrew the 2 fixing screws [8] fixing the head 17. Install covers between each head. front cover R [9], and remove the head front covers R [9]. 8 9 13. Grease the cam groove of the thread take-up driving cams. 14. Attach the head front covers R [9]. 4/8/05 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9

4/8/05
7
Monthly Maintenance
Greasing
Cam grooves continued
11. Move the needle bar case to the needle bar No.1
position by rotating the color change knob.
12. Unscrew the 2 fixing screws [8] fixing the head
front cover R [9], and remove the head front
covers R [9].
13. Grease the cam groove of the thread take-up
driving cams.
14.
Attach the head front covers R [9].
15. Install left end head cover.
16. Install right end head cover.
17. Install covers between each head.
For Technical Assistance Please Call Toll Free
1-877-4BROTHER
Email:
Website
:
B
B
E
E
-
-
1
1
2
2
0
0
4
4
,
,
1
1
2
2
0
0
6
6
9
8