Cisco IE-3010-16S-8PC Hardware Installation Guide - Page 41

Wall-Mounting the Cisco IE-3010-16S-8PC, the Switch with the CLI Setup Program.

Page 41 highlights

Chapter 2 Switch Installation Figure 2-15 Wall-Mounting the Cisco IE-3010-16S-8PC Installing the Switch C isco C onnected G rid Sw itch 2500 Series 1 207557 After the switch is mounted on the wall: • Wire the switch to a power source. See Chapter 3, "Power Supply Installation." • For configuration instructions about using the CLI setup program, go to Appendix C, "Configuring the Switch with the CLI Setup Program." • Connect the switch ports. See the "Connecting Devices to the Ethernet Ports" section on page 2-25. 78-19581-01 Cisco IE 3010 Switch Hardware Installation Guide 2-19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98

2-19
Cisco IE 3010 Switch Hardware Installation Guide
78-19581-01
Chapter 2
Switch Installation
Installing the Switch
Figure 2-15
Wall-Mounting the Cisco IE-3010-16S-8PC
After the switch is mounted on the wall:
Wire the switch to a power source. See
Chapter 3, “Power Supply Installation.”
For configuration instructions about using the CLI setup program, go to
Appendix C, “Configuring
the Switch with the CLI Setup Program.”
Connect the switch ports. See the
“Connecting Devices to the Ethernet Ports” section on page 2-25
.
Cisco
Switch 2500 Series
Connected Grid
207557
1