Compaq ProLiant 3000 SMART-2DH Array Controller Reference Guide - Page 88
indicating that the controller has recognized and successfully initialized
View all Compaq ProLiant 3000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 88 highlights
6-20 Installing the Operating System Drivers For hot-pluggable drives, after you secure the drive in the bay, the LEDs on the drive will all light once in an alternating pattern to indicate that the connection was successful. The Online LED will turn green, indicating that the controller has recognized and successfully initialized the replacement drive. If the Online LED does not light after a few minutes, verify that you added the new drive in the same slot as the failed drive and that the drive capacity is the same as the failed drive it is replacing. Writer: Pamela King Project: SMART-2DH Array Controller Reference Guide Comments: 295469-002 File Name: G-CH06.DOC Last Saved On: 2/27/98 12:01 PM COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED