D-Link DGS-1520-28MP Product Manual 2 - Page 19
Connecting AC Power to the Switch, Installing the AC Power Cord Retainer
View all D-Link DGS-1520-28MP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
DGS-1520 Series Gigabit Ethernet Smart Managed Switch Hardware Installation Guide Connecting AC Power to the Switch To connect AC power to the Switch, plug one end of the AC power cord into the AC power socket of the Switch and the other end of the AC power cord into the local AC power source outlet. There is no power switch/button on the Switch. The system will power on automatically. After the system is powered on, the Power LED will blink green to indicate that the system is booting up. In the event of a power failure, just as a precaution, unplug the power cord from the Switch. After the power returned, plug the power cord back into the power socket of the Switch. Installing the AC Power Cord Retainer To prevent accidental removal of the AC power cord, it is recommended to install the AC Power Cord Retainer Set together with the AC power cord. The AC Power Cord Retainer Set is included in the package contents. With the rough side facing down, insert the tie wrap into the hole below the power socket. Figure 3-5 Insert Tie Wrap into the Switch Plug the AC power cord into the power socket of the Switch. Figure 3-6 Connect the power cord to the Switch 14