Dacor HDPR36 Installation Instruction - Dual-fuel Range - Page 17
Location Requirements
View all Dacor HDPR36 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
Installation Requirements Location Requirements Gas/Electrical Range Hookups (HDPRS/HDERS 30", 36", 48") 48" model shown GAS-/ELECTRICAL-ACCESS DIMENSIONS Model A B* C D* E** HDPR30S/HDER30S 3 1/4" (8.3 cm) 27" (68.6 cm) 6 3/4" (17.1 cm) HDPR36S/HDER36S 6 3/4" (17.1 cm) 27" (68.6 cm) 12" (30.5 cm) 6 3/4 (17.1 cm) 7/8" (2.2 cm) dia. HDPR48S/HDER48S 4 1/4" (10.8 cm) 27" (68.6 cm) 9" (22.9 cm) *Measurement with range legs adjusted to their lowest height; **the hole size for the electrical wiring may be increased to 1 1/8" (2.9 cm) by removing the conduit bracket in the bottom of the electrical box. Gas/Electrical Service Inlets • Existing utilities may be used if compatible with the requirements in this manual. (See building codes for allowed gas-valve locations.) • An external shut-off valve must be installed between the gas inlet and range so its gas supply can be turned on/off. • The valve and the circuit-breaker panel/fuse box must be accessible without moving the range. • The gas-supply piping, shut-off valve, and the electrical junction box/receptacle must not interfere with the placement requirements for the range. • The junction box and gas-shut off valve must be located so the range can be pulled out for service without being disconnected. English 17