Dell Brocade 300 Hardware Reference Manual - Page 15
Installing and Configuring the Brocade 5000, Items Included with the Brocade 5000
View all Dell Brocade 300 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
Chapter Installing and Configuring the Brocade 5000 2 This chapter provides the following information: - "Items Included with the Brocade 5000," next - "Installation and Safety Considerations" on page 5 - "Setting Up the Switch Using Mounting Ears" on page 6 - "Setting Up the Brocade 5000 as a Standalone Unit" on page 7 - "Configuring the Brocade 5000" on page 7 - "Recommendations for Cable Management" on page 13 Items Included with the Brocade 5000 The following items are included with the standard shipment of the Brocade 5000: - The Brocade 5000 switch, containing two power supply/fan assembly units - One accessory kit, containing the following items: - The Brocade 5000 QuickStart Guide - The Brocade Documentation CD-ROM - 32 SFP (small-form-factor pluggable) transceivers (optional) - Mounting ears and screws - Rubber mounting feet (to be used when setting up the Brocade 5000 as a standalone unit) - Two grounded 6-ft. (approximately 1.83 meters) power cords - The power plug type is NEMA5-15 - Power plug current/voltage rating: 1.4A/125V - Cordage type: SVT - Current rating/wire gauge: 10A/ 18AWG - Connector at system end of cordset: IEC 60320/ C13 - One serial cable, 10-ft. (approximately 3 meters) long - EZSwitch Setup CD - EZSwitch Setup ReadMe First document - Fabric Manager Evaluation CD Installation and Safety Considerations You can install the Brocade 5000 in the following four ways: Brocade 5000 Hardware Reference Manual 5 Publication Number: 53-1000424-03