Dell PowerConnect 8100 Getting Started Guide - Page 13
Installation, Site Preparation, Unpacking the Switch, Package Contents
View all Dell PowerConnect 8100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
Installation Site Preparation Before installing the switch or switches, make sure that the chosen installation location meets the following site requirements: • Clearance-There is adequate front and rear clearance for operator access. Allow clearance for cabling, power connections, and ventilation. • Cabling-The cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures. • Ambient Temperature-The ambient switch operating temperature range is 10° to 35ºC (50° to 95ºF). NOTE: Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.) above 900 m (2955 ft.). • Relative Humidity-The operating relative humidity is 8% to 85% (noncondensing) with a maximum humidity gradation of 10% per hour. Unpacking the Switch Package Contents When unpacking each switch, make sure that the following items are included: • One PowerConnect switch • One RJ45-to-DB-9 female cable • Two sets of rail kits (no tools required) • Two PSUs (packed separately) • Two AC power cords (country/region specific) • Getting Started Guide • Safety and Regulatory Information • Warranty and Support Information • Software License Agreement Installation 11