Dell PowerEdge 2950 Rack Installation Guide - Page 20
Routing Cables, Getting Started Guide, Hardware Owner's, Manual
View all Dell PowerEdge 2950 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
Routing Cables 1 Open the wire cable basket on the top of the cable-management arm, to enable cables to be routed within the arms (see Figure 1-9). Figure 1-9. Routing Cables on the Cable-Management Arm 1 2 1 tie wraps (2) 3 cable-management arm 4 3 2 system status-indicator cable connector 4 wire cable basket 2 If applicable, connect the system status-indicator cable to its connector on the system back panel. Route the system status-indicator cable through the cable-management arm, and press the LED end into the slot on the end of the cable-management arm until it snaps into place. 3 Attach the I/O cable connectors and power cable connectors to their respective connectors on the system back panel. For details on cable connections, see your system's Getting Started Guide or Hardware Owner's Manual. NOTE: Use the retainer brackets on the back of the power supplies to provide strain relief for the power cables. 4 Route the cables along the bend in the cable-management arm. 5 Adjust the cable slack as needed at the hinge position and secure the cables with the tie wraps (see Figure 1-9). 6 Close the cable basket. 18 Rack Installation Guide