Figure 12: Zero U Mount PDUs In order to install Zero U mount PDUs with hardwired cables and connectors that are too large to fit through the gap between the rear mounting rail and the PDU trays, follow these steps for mounting: 1. Insert the PDU through the gap between the rear mounting rail and the PDU tray. Installation should be from the inside of the rack. 2. From the side of the rack, snap the PDU tray into the mounting rail. Ensure that the cable is tucked back into the rack so that there's no interference between either a side panel or with any part of an adjacent rack. See Figure 13. 3. Once PDUs are installed, connect equipment power cords and dress them to assure that they are not under stress. Dell Inc. | Data Center Infrastructure 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17

Dell Inc. |
Data Center Infrastructure
13
Figure 12: Zero U Mount PDUs
In order to install Zero U mount PDUs with hardwired cables and connectors that are too large to fit through the gap
between the rear mounting rail and the PDU trays, follow these steps for mounting:
1.
Insert the PDU through the gap between the rear mounting rail and the PDU tray.
Installation should be
from the inside of the rack.
2.
From the side of the rack, snap the PDU tray into the mounting rail.
Ensure that the cable is tucked back
into the rack so that there’s no interference between either a side panel or with any part of an adjacent rack.
See Figure 13.
3.
Once PDUs are installed, connect equipment power cords and dress them to assure that they are not under