Dell PowerVault 114T 2U Rack Installation Guide (.pdf) - Page 1
Dell PowerVault 114T 2U Manual
View all Dell PowerVault 114T 2U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 1 highlights
www.dell.com | support.dell.com Installation and Removal Instructions for Dell PowerVaultTM 114T FX973 Ferrite Core Kit If ferrites are present, there is no need to replace or install new ones. When replacing SCSI cables or power supplies with ferrites attached, refer to Adding Ferrites to New SCSI Cables or Power Supply to open ferrites. Power Cables - Ferrite Installation Place one ferrite on each of the power cables that connect to the tape drive (see Figure 1-2). Figure 1-1. Open Ferrite for Power Cable Figure 1-2. Ferrites Installed on Power Cables October 2007
www.dell.com | support.dell.com
Installation and Removal Instructions for Dell PowerVault
TM
114T
If ferrites are present, there is no need to replace or install new ones. When replacing SCSI cables or power
supplies with ferrites attached, refer to
Adding Ferrites to New SCSI Cables or Power Supply
to open ferrites.
Power Cables – Ferrite Installation
Place one ferrite on each of the power cables that connect to the tape drive (see Figure 1-2).
Figure 1-1.
Open Ferrite for Power Cable
Figure 1-2.
Ferrites Installed on Power Cables
October 2007
FX973 Ferrite Core Kit