Dell S4112F S4112-ON Series Setup Guide - Page 14
Half-RU front-rack installation
![]() |
View all Dell S4112F manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
power ratings do not exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock hazards. • Elevated ambient temperature-If you install the switch in a closed rack assembly, the operating temperature of the rack environment may be greater than the room ambient temperature. Use care not to exceed the 45°C (113°F) maximum ambient temperature of the switch. • Reduced air flow-Do not compromise the amount of airflow required for safe operation of the equipment. Install the equipment in the rack so that the equipment constantly has the correct amount of airflow surrounding it. • Reliable earthing-Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit, for example: use of power strips. • Do not mount the equipment with the fan panel facing in the downward position. Half-RU front-rack installation The dual-tray mounting rails ship with the dual tray, not with the switch. You must supply eight rack-mount screws for this four-post installation. NOTE: Do not install the dual tray in a two-post rack. Installation instructions follow this order: 1 Attach the rails to the dual tray. 2 Install the dual tray in the rack. 3 Attach the ground cable to the switch. 4 Install the switch in the dual tray. 1 Remove the dual tray and the rails from the shipping packaging and place them on a clean anti-static surface. 2 Line up the three holes on the inner switch rail with the dual-tray mounting heads. 14 S4112-ON Series Installation
![](/manual_guide/products/dell-powerswitch-s4112fon-s4112on-series-setup-guide-b13acb4/14.png)