Electrolux EI16DDPRKS Installation Instructions (English, Spanish, French) - Page 10

Installation on Floor Joists

Page 10 highlights

10 Installation on Floor Joists Romex or Metal Conduit Floor Joists Inlet Metal Duct Discharge Duct Main Blower Housing Lag Bolts must be attached to joists, studs or structural members. 1/4" Lag Bolts (4) Conduit / Romex Inlet Flooring Floor Joist 1/4" Lag Bolts (4) Discharge

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

10
Installation on Floor Joists
Inlet
Discharge
1/4” Lag Bolts (4)
Floor Joist
Flooring
Conduit / Romex
Lag Bolts must be
attached to joists, studs
or structural members.