Epson BrightLink EB-725Wi Installation Guide - Page 71
Drill two holes where indicated and remove the template sheet.
View all Epson BrightLink EB-725Wi manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 71 highlights
English 2. For non-magnetic boards or screens, attach the template sheet to the board. Line up the pattern on the bottom of the sheet with the top of the projected pattern. Drill two holes where indicated and remove the template sheet. 71
71
English
2.
For non-magnetic boards or screens, attach the template sheet to the board.
Line up the pattern on the bottom of the sheet with the top of the projected pattern.
Drill two holes where indicated and remove the template sheet.