Frigidaire FFRE0633U1 Installation Instructions - Page 1
Frigidaire FFRE0633U1 Manual
View all Frigidaire FFRE0633U1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 1 highlights
Installation Instructions READ BEFORE INSTALLING UNIT BK Window Mounting (5,000 - 6,000 BTU) INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. be exposed: Carefully inspect location where air conditioner will be installed. Be sure it will support the weight of the unit over an extended period of time. NOTE: the best way to store unit during winter, or when not in use. Top Rail Hardware Qty. 4 Top Rail 1 Before installing, the top rail must be assembled on the unit. Mounting Hardware (For Wooden windows) (For Vinyl-Clad windows) Qty. 7 2 2 1 weather seals 5 window sash seal foam 1 insulation panel 2 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 ruler 1 Drill (If pilot holes are needed) Top Rail Fig. B Fig. C 1 66129926906