Frigidaire FFTA103WA1 Installation Instructions - Page 2

Common Wall-Sleeve Dimensions - installation

Page 2 highlights

Installation Instructions Common Wall-Sleeve Dimensions 1. Identify the wall-sleeve brand for your installation, from the chart below. GE/Hotpoint/Amana Fedders/Emerson/Friedrich (WSE)* 15 5 8" 16 7 8" 16 7 8" Friedrich (USC) 15 1 2" For larger sleeves, an adaptor trim kit (EA120T) is available. 25 7 8" 25 7 8" 16", 17 ½", or 22" 16", 17 ½", or 22" 16", 17 ½", or 22" 16 7 8" 17 1 8" or 23" 18 5 8" 18 5 8" 16 3 4" IMPORTANT All wall sleeves used to mount the new air conditioner must be in sound structural condition and have a rear grille that securely attached to the sleeve, or rear flange that serves as a stop for the air conditioner. For new or replacement installations, a Frigidaire Sleeve Kit (5304514430) is recommended. NOTE: When installation is complete, replacement unit must have rearward slope as shown in Fig 1. t3FNPWFPMEBJSDPOEJUJPOFSGSPNXBMMTMFFWFBOEQSFQBSFXBMMTMFFWFBTGPMMPXT 1. Clean interior (do not disturb seals) 2. Check to see that sleeve is securely fastened in wall. Add additional screws or nails as required. 3FUPVDIXBMMTMFFWFQBJOUFETVSGBDFJGOFFEFE 4. If a ground wire or mounting hole does not exist, drill a pilot hole for a grounding screw through the left hand side of the sleeve. Drill in a clear area about 3 inches back from the front edge a 3/16" pilot hole for the ground screw. Pull the loose end of the ground wire out of the front of the sleeve and bend it away from the opening. This will be attached to the air conditioner once installed. Wall Sleeve 3FBS Fig.1 1/4" to 5/16" Front Wall sleeve to unit Grounding. 1" Level 3" Max 3/16" Pilot Hole Sleeve Fig.2 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Common Wall-Sleeve Dimensions
IMPORTANT
All wall sleeves used to mount the new air conditioner must be in sound structural condition and have a rear
grille that securely attached to the sleeve, or rear flange that serves as a stop for the air conditioner.
For new or replacement installations, a Frigidaire Sleeve Kit (5304514430) is recommended.
1.
Identify the wall-sleeve brand for your installation, from the chart below.
1. Clean interior (do not disturb seals)
2. Check to see that sleeve is securely fastened in wall. Add additional screws or nails as required.
4. If a ground wire or mounting hole does not exist, drill a pilot hole for a grounding screw through the left hand
side of the sleeve. Drill in a clear area about 3 inches back from the front edge a 3/16” pilot hole for the ground
screw. Pull the loose end of the ground wire out of the front of the sleeve and bend it away from the opening.
This will be attached to the air conditioner once installed.
NOTE:
When installation is complete, replacement unit must have rearward slope as shown in Fig 1.
1/4” to 5/16”
Wall Sleeve
Front
2
.
g
i
F
1
.
g
i
F
Level
Sleeve
3/16” Pilot Hole
Wall sleeve to unit
Grounding.
3”
Max
1”
GE/Hotpoint/Amana
Friedrich (USC)
Fedders/Emerson/Friedrich (WSE)*
For larger sleeves, an adaptor trim kit (EA120T) is available.
16”, 17 ½”, or 22”
16”, 17 ½”, or 22”
16”, 17 ½”, or 22”
16
7
8
17
” or 23”
1
8
18
5
8
18
5
8
16
3
4
25
7
8
15
1
2
16
7
8
16
7
8
15
5
8
25
7
8
2
Installation Instructions