Fujitsu MHN2200AT Manual/User Guide - Page 59
Power-on Sequence, After confirming that the spindle motor has reached rated speed, the head
View all Fujitsu MHN2200AT manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 59 highlights
4.3 Circuit Configuration 4.4 Power-on Sequence Figure 4.4 describes the operation sequence of the disk drive at power-on. The outline is described below. a) After the power is turned on, the disk drive executes the MPU bus test, internal register read/write test, and work RAM read/write test. When the self-diagnosis terminates successfully, the disk drive starts the spindle motor. b) The disk drive executes self-diagnosis (data buffer read/write test) after enabling response to the ATA bus. c) After confirming that the spindle motor has reached rated speed, the head assembly is loaded on the disk. d) The disk drive positions the heads onto the SA area and reads out the system information. e) The disk drive executes self-seek-calibration. This collects data for VCM torque and mechanical external forces applied to the actuator, and updates the calibrating value. f) The drive becomes ready. The host can issue commands. C141-E120-02EN 4-7