Garmin GAD 43 Installation Manual - Page 37

SYSTEM CONFIGURATION AND CHECKOUT, 1 Post Installation Power Check, 2 GAD 43 Software Loading,

Page 37 highlights

5. SYSTEM CONFIGURATION AND CHECKOUT 5.1 Post Installation Power Check Verify that all cables are properly secured and shields are connected to the shield block of the connector. Check the movement of the flight and engine controls to verify that there is no interference. Ensure wiring is installed in accordance with AC 43.13-1B, Chapter 11. Verify that the power and ground leads are correct. 5.2 GAD 43 Software Loading Prior to using the GAD 43, the required GAD 43 software should be loaded as specified in Section 5 of the GDU 620 Installation Manual (190-00601-04). 5.3 Initial Configuration of the GAD 43 NOTE To access and modify the GAD 43 configuration page, an Installer Unlock Card P/N 010-00769-60 must be inserted in the bottom card slot prior to applying power to the GDU 620. As part of the initial configuration, the GAD 43 functions must be enabled/disabled as desired, external data sources must be configured, and miscellaneous options must be set up. To do this an Installer Unlock Card (P/N 010-00769-60) must be inserted into the GDU 620, and the GDU 620 must be started in configuration mode by pressing and holding the ENT button while applying power. When the GDU 620 is in configuration mode, the left display has only one page that is used to display status and product information of the various LRUs. The right display has multiple pages that are used to configure and checkout the installation of the various LRUs including the GAD 43. GAD 43 Installation Manual 190-00899-00 Page 5-1 Rev. B

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62

GAD 43 Installation Manual
Page 5-1
190-00899-00
Rev. B
5.
SYSTEM CONFIGURATION AND CHECKOUT
5.1 Post Installation Power Check
Verify that all cables are properly secured and shields are connected to the shield block of the connector.
Check the movement of the flight and engine controls to verify that there is no interference. Ensure wiring
is installed in accordance with AC 43.13-1B, Chapter 11. Verify that the power and ground leads are
correct.
5.2 GAD 43 Software Loading
Prior to using the GAD 43, the required GAD 43 software should be loaded as specified in Section 5 of
the GDU 620 Installation Manual (190-00601-04).
5.3
Initial Configuration of the GAD 43
NOTE
To access and modify the GAD 43 configuration page, an Installer Unlock Card
P/N 010-00769-60 must be inserted in the bottom card slot prior to applying power to the
GDU 620.
As part of the initial configuration, the GAD 43 functions must be enabled/disabled as desired, external
data sources must be configured, and miscellaneous options must be set up. To do this an Installer Unlock
Card (P/N 010-00769-60) must be inserted into the GDU 620, and the GDU 620 must be started in
configuration mode by pressing and holding the ENT button while applying power.
When the GDU 620 is in configuration mode, the left display has only one page that is used to display
status and product information of the various LRUs. The right display has multiple pages that are used to
configure and checkout the installation of the various LRUs including the GAD 43.