GE AZ61H12DAB Owners Manual - Page 13
db d5 d5 - amps
View all GE AZ61H12DAB manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
Installation Instructions 230/208 VOLT ELECTRICAL CONNECTION OPTIONS HOW TO CONNECT 1. Remove the room cabinet. 2. Connect to electrical power. 3. Review the following steps for applicable supplg voltages. 4. Reinstall the room cabinet. Power cords mag include an arc fault interruption or a leakage current detection interruption device. A test and reset button is provided on the plug case or the inline case. The device should be tested on a periodic basis bg first pressing the TESTbutton and then the RESETbutton. If the TEST button does not trip or if the RESETbutton will not stag engaged, discontinue use of the Zoneline and contact a qualified service technician. POWER CORD CONNECTION A power supplg kit with LCDImust be usedto supplg power to the Zonelineunit. Theappropriate kit isdetermined bg the voltage, the means of electrical connection and the amperage of the branch circuit. Power supply kit Connections of 208 or 230-volt circuits mag be with a power supplg kit or a junction box kit. All wiring, including installation of the receptacle, must be in accordance with the NEC and local codes, ordinances and regulations. Codes require the use of an arc fault or leakage current detection device on the power cord except direct connect. Be sure to select the correct cord for gour installation. db d5 d5 Tandem 15Amp. Perpendicular 20 Amp. LargeTandem 30 Amp. 230/208-voltreceptacleconfiguration. Branch Circuit and Unit Amperage Rating 15 20 30 Proper GE Power Cord with LCDI Device RAK5155 RAK3203 RAK3303* *Not approved for use on 7000 BTU models. ELECTRICAL SUBBASE CONNECTION 230/208-volt models may be installed using one of the following electrical subbases: Branch Circuit and Unit Amperage Rating 15 20 30 Proper GE Subbase Kit RAK204D15P RAK204D20P RAK204D30P* *Not approved for use on 7000 BTUmodels. Electricalsubbases provide an enclosure for direct connection or enclosed receptacles.The subbase kit includes the power cord. The instructions provided with the selected subbase kit must be carefully followed. It is the responsibility of the installer to ensure the connection of components is done in accordance with these instructions and all electrical codes. DIRECT CONNECTION Order the following Kit for 230/208-volt direct connection as required: Branch Circuit and Unit Amperage Rating 15 Power Supply Accessorg RAK4002A Power Supply Kit RAK4157 20 RAK4002A RAK4207 30 RAK4002A RAK4307* *Not approved for useon 7000 BTUmodels. Skipto the "HAKE ELECTRICACLONNECTIONTOTHE UNIT" section. 13