GE JGP975SEKSS Installation Instructions - Page 4
Installation Instructions, PREPARING THE OPENING
UPC - 084691114529
View all GE JGP975SEKSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
Installation Instructions PREPARING THE OPENING 1 Maintain the following MINIMUM clearance dimensions 13″ MAX. Depth of unprotected overhead cabinets 6″ MIN. clearance from 3c3/u4tMoINu.t to side wall on the right of the unit 30″ MIN. clearance from countertop to unprotected overhead surface 18″ MIN. height from countertop to nearest cabinet on either side of unit 3-3/4″ MIN. clearance from cutout to side wall on the left of the unit NOTE: All gas cooktop models require 7/16″ free area below cooktop height to combustible material. 2 Overall cooktop dimensions 36″ Cooktop 21″ (21-1/4″ Max. for Glass Top models) 3″ 18-7/8″ 33-11/16″ 4 Recommended Gas Supply Location from backwall 1" Min. From Backwall Recommended gas supply location From Cutout Center Line 5 Make sure wall coverings, countertop and cabinets around cooktop can withstand heat (up to 200°F) generated by cooktop Wall covering, cabinets and countertop must withstand heat up to 200°F 3 Cutout dimensions of countertop To ensure accuracy, it is best to make a template when cutting the opening in the counter. 2-1/4" Min. Between cutout and the wall behind the cooktop 33-7/8" length of cut 19-1/8" width cut 16-15/16″ 2-1/2" Min. from front edge of cutout and front edge of countertop 4