GE JP3530SJSS Installation Instructions - Page 8
Installation Instructions, CHECKLISTS
View all GE JP3530SJSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
CHECKLISTS Installation Instructions 1 PRE-TEST CHECKLIST A Remove all protective film, if present, and any stickers. B Check to be sure that all wiring is secure and not pinched or in contact with moving parts. C Check level of appliance. D Check that the cooktop is properly grounded. 2 OPERATION CHECKLIST A Remove all items from the top of the cooktop surface. B Turn on the power to the cooktop.(Refer to your Owner's Manual.) Verify that all surface burners operate properly. C Check that the circuit breaker is not tripped nor the house fuse blown. D Check that conduit is securely connected to the junction box. NOTE TO ELECTRICIAN: The power leads supplied with this appliance are UL recognized for connections to larger gauge household wiring. The insulation of these leads is rated at temperatures much higher than the temperature rating of household wiring. The current carrying capacity of a conductor is governed by the wire gauge and also the temperature rating of the insulation around the wire. NOTE: ALUMINUM WIRING • WARNING: IMPROPER CONNECTION OF ALUMINUM HOUSE WIRING TO THE COPPER LEADS CAN RESULT IN A SERIOUS PROBLEM. • Splice copper wires to aluminum wiring using special connectors designed and UL approved for joining copper to aluminum and follow the manufacturer's recommended connector procedure closely. NOTE: Wire used, location and enclosure of splices, etc., must conform to good wiring practice and local codes. 8