GE PDT845SSJSS Installation Instructions - Page 5

PREPARE HOT WATER LINE, Water Line Connection, Turn to begin dishwasher installation.

Page 5 highlights

Installation Preparation PREPARE HOT WATER LINE NOTE: GE recommends copper tubing for the water line, but if \RXFKRRVHWRXVHÀH[LEOHKRVHXVH*(·VWX28X326ÀH[LEOH braided hose. • The water supply line (3/8" copper tubing or flexible braided hose) may enter from either side, rear or floor within the shaded area shown in Figure F. • The water supply line may pass through the same hole as the electrical cable and drain hose. Or, cut an additional 1-1/2" diameter hole to accommodate the water line. If power cord with plug is used, water line must not pass through power cord hole. CAUTION Do not remove wood base until you are ready to install the dishwasher. The dishwasher will tip over when the door is opened if base is removed. 1-1/2" Dia. Shut-off Hole 4" Valve Hot 2" 6" From Cabinet 19" From Wall Cabinet Face 2" From Floor Figure F Water Line Connection • If using a flexible braided supply hose, label the hose with the installation date to use as reference. Flexible braided hoses, elbows and gaskets should be replaced in 5 years. • Turn off the water supply. • Install a hand shut-off valve in an accessible location, such as under the sink. (Optional, but strongly recommended and may be required by local codes.) • Water connection is on the left side of the dishwasher. Install the hot water inlet line, using no less than 3/8" copper tubing or a flexible braided hose. Route the line as shown in Figure F and extend forward at least 19" from rear wall. ‡$GMXVWZDWHUKHDWHUIRUƒ)WRƒ)WHPSHUDWXUH • Flush water line to clean out debris. • The hot water supply line pressure must be 20-120 PSI. Turn page to begin dishwasher installation. 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

PREPARE HOT WATER LINE
NOTE:
GE recommends copper tubing for the water line, but if
WX28X326
braided hose.
• The water supply line (3/8” copper tubing or flexible braided
hose) may enter from either side, rear or floor within the
shaded area shown in Figure F.
• The water supply line may pass through the same hole as the
electrical cable and drain hose. Or, cut an additional 1-1/2"
diameter hole to accommodate the water line. If power cord
with plug is used, water line must not pass through power
cord hole.
Figure F
Water Line Connection
• If using a flexible braided supply hose, label the hose with the
installation date to use as reference. Flexible braided hoses,
elbows and gaskets should be replaced in 5 years.
• Turn off the water supply.
• Install a hand shut-off valve in an accessible location, such
as under the sink. (Optional, but strongly recommended and
may be required by local codes.)
• Water connection is on the left side of the dishwasher. Install
the hot water inlet line, using no less than 3/8" copper tubing
or a flexible braided hose. Route the line as shown in Figure F
and extend forward at least 19" from rear wall.
• Flush water line to clean out debris.
• The hot water supply line pressure must be 20-120 PSI.
Turn page to begin dishwasher installation.
6"
4"
Cabinet Face
Shut-off
Valve
2" From Floor
19" From Wall
2"
From
Cabinet
1-1/2" Dia.
Hole
Hot
Installation Preparation
5
Do not remove wood base until you are ready to install the
dishwasher. The dishwasher will tip over when the door is
opened if base is removed.
CAUTION