GE PSB9240DFBB Installation Instructions - Page 7

Installation Preparation, Preparation, an Accessory Storage Drawer

Page 7 highlights

Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING (CONT.) Installation over a GE/Monogram Oven: 30" 23-1/2" Construct Solid Bottom Min. 3/8" Plywood Supported by 2x4 or 2x2 25-1/4" Runners all Four Sides 17-1/2" 45-1/4" Min. 2" Min. (3" recommended) Per Oven Requirement PREPARE THE OPENING (CONT.) Installation over a GE/Monogram Oven and Warming Drawer: Construct 30" 23-1/2" Solid Bottom Min. 3/8" Plywood Supported by 2x4 or 2x2 25-1/4" Runners all Four Sides 17-1/2" 2" Min. (3" recommended) Per Oven Requirement 45-1/4" 2" Min. Min. Per warming drawer requirement ‡,I\RXDUHUHSODFLQJD*(0RQRJUDPHOHFWULF double oven with the combined installation of an Advantium 240V and a single oven, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2" minimum shown. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. CAUTION: For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate 80-pound oven, plus additional oven loads of up to 50 pounds or a total weight of 130 pounds. PRECAUCIÓN: Para seguridad personal, la superficie de montaje debe poder soportar la carga del gabinete, además del peso aproximado de 80 libras del horno, más las cargas adicionales del horno de hasta 50 libras o un peso total de hasta 130 libras. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

Installation Preparation
7
Preparation
WITHOUT
an Accessory Storage Drawer
PREPARE THE OPENING
(CONT.)
Installation over a GE/Monogram Oven and
Warming Drawer:
NOTE:
Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location do
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.
CAUTION:
For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate 80-pound oven, plus additional
oven loads of up to 50 pounds or a total weight
of 130 pounds.
PRECAUCIÓN:
Para seguridad
personal, la superficie de montaje debe poder
soportar la carga del gabinete, además del peso
aproximado de 80 libras del horno, más las
cargas adicionales del horno de hasta 50 libras
o un peso total de hasta 130 libras.
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
Per Oven
Requirement
45-1/4”
Min.
Per warming drawer requirement
2” Min.
(3” recommended)
PREPARE THE OPENING
(CONT.)
Installation over a GE/Monogram Oven:
double oven with the combined installation of
an Advantium 240V and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2” minimum shown.
30”
23-1/2”
25-1/4”
17-1/2”
2” Min.
(3” recommended)
45-1/4”
Min.
Construct Solid
Bottom Min.
3/8” Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
Per Oven
Requirement