GE PSB9240DFBB Installation Instructions - Page 7
Installation Preparation, Preparation, an Accessory Storage Drawer
View all GE PSB9240DFBB manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING (CONT.) Installation over a GE/Monogram Oven: 30" 23-1/2" Construct Solid Bottom Min. 3/8" Plywood Supported by 2x4 or 2x2 25-1/4" Runners all Four Sides 17-1/2" 45-1/4" Min. 2" Min. (3" recommended) Per Oven Requirement PREPARE THE OPENING (CONT.) Installation over a GE/Monogram Oven and Warming Drawer: Construct 30" 23-1/2" Solid Bottom Min. 3/8" Plywood Supported by 2x4 or 2x2 25-1/4" Runners all Four Sides 17-1/2" 2" Min. (3" recommended) Per Oven Requirement 45-1/4" 2" Min. Min. Per warming drawer requirement ,I\RXDUHUHSODFLQJD*(0RQRJUDPHOHFWULF double oven with the combined installation of an Advantium 240V and a single oven, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2" minimum shown. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. CAUTION: For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate 80-pound oven, plus additional oven loads of up to 50 pounds or a total weight of 130 pounds. PRECAUCIÓN: Para seguridad personal, la superficie de montaje debe poder soportar la carga del gabinete, además del peso aproximado de 80 libras del horno, más las cargas adicionales del horno de hasta 50 libras o un peso total de hasta 130 libras. 7