GE PSB9240DFBB Installation Instructions - Page 8

Prepare The Opening

Page 8 highlights

Installation Preparation Preparation WITH an Accessory Storage Drawer NOTE: MODEL ZSC2202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT AN ACCESSORY STORAGE DRAWER FOR THIS MODEL. PREPARE THE OPENING The Advantium 240V can be installed in combination with other GE/Monogram appliances. Always follow each product's Installation Instructions to complete the installation. Single Advantium 240V Installation: Order a 30" wide single oven cabinet or cut the opening in a wall to the dimensions shown. 30" 23-1/2" 25-1/4" Min.* 21" 36-3/4" Min. Construct Base Min. 3/8" Plywood Supported by 2x4 or 2x2 Runners all Four Sides * For existing cutouts, a maximum width of 28-1/2" is acceptable. If the opening is slightly wider, secure a furring strip on each side of the cutout for securing the oven. ‡ $OZD\VPDLQWDLQµPLQLPXPKHLJKWIURP the floor to the cutout in any single or combined installation. ‡Allow 3/4" to 2-1/8" case trim overlap on the sides and 7/8" overlap on the bottom of the opening for all models. The amount of overlap on the sides depends on the actual cutout width. Allow 1-1/4" case trim overlap on the top for model PSB9120 and 3/4" overlap on the top for models ZSC2200, ZSC2200, ZSC2201 and ZSC2202. ‡ 2YHQRYHUODSVZLOOFRQFHDOFXWHGJHVRQDOOVLGHV of the opening. PREPARE THE OPENING (CONT.) Single Advantium 240V Installation (cont.) When installed over a single oven or a warming drawer, allow at least 2" between the two openings. This separation will provide clearance for bottom overlap of the Advantium 240V and the other appliance overlaps. Construct a solid oven floor of 3/8" min. thick plywood supported by 2 x 4 or 2 x 2 runners on all sides. ‡7KHVXSSRUWPXVWEHOHYHODQGULJLGO\PRXQWHG flush with the bottom edge of the cutout. Installation over a GE/Monogram Warming Drawer: 30" 23-1/2" Construct * Solid Bottom Min. 3/8" Plywood Supported 25-1/4" by 2x4 or 2x2 Min.* Runners all Four Sides 2" Min. 21" (3" recommended) Per warming drawer requirement 36-3/4" Min. For existing cutouts, a maximum width of 28-1/2" is acceptable. If the opening is slightly wider, secure a furring strip on each side of the cutout for securing the oven. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

8
Installation Preparation
Preparation
WITH
an Accessory Storage Drawer
NOTE: MODEL ZSC2202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION
WITHOUT AN ACCESSORY STORAGE DRAWER FOR THIS MODEL.
Installation over a GE/Monogram
Warming Drawer:
*
For existing cutouts, a maximum width of 28-1/2”
is acceptable. If the opening is slightly wider,
secure a furring strip on each side of the cutout
for securing the oven.
NOTE:
Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location do not
obstruct the required interior depth and height. See
Warming Drawer installation instructions for details.
30”
23-1/2”
25-1/4”
Min.*
21”
36-3/4”
Min.
2” Min.
(3” recommended)
Per warming
drawer
requirement
Construct
Solid Bottom
Min. 3/8”
Plywood
Supported
by 2x4 or 2x2
Runners all
Four Sides
PREPARE THE OPENING
The Advantium 240V can be installed in
combination with other GE/Monogram appliances.
Always follow each product’s Installation
Instructions to complete the installation.
Single Advantium 240V Installation:
Order a 30” wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
*
For existing cutouts, a maximum width of 28-1/2”
is acceptable. If the opening is slightly wider,
secure a furring strip on each side of the cutout
for securing the oven.
the floor to the cutout in any single or combined
installation.
Allow 3/4” to 2-1/8” case trim overlap on the sides
and 7/8” overlap on the bottom of the opening
for all models. The amount of overlap on the sides
depends on the actual cutout width. Allow 1-1/4”
case trim overlap on the top for model PSB9120
and 3/4” overlap on the top for models ZSC2200,
ZSC2200, ZSC2201 and ZSC2202.
of the opening.
30”
23-1/2”
25-1/4”
Min.*
21”
Construct
Base
Min. 3/8”
Plywood
Supported
by 2x4 or
2x2 Runners
all Four
Sides
36-3/4”
Min.
PREPARE THE OPENING
(CONT.)
Single Advantium 240V Installation (cont.)
When installed over a single oven or a warming
drawer, allow at least 2” between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 240V and the other
appliance overlaps.
Construct a solid oven floor of 3/8” min. thick plywood
supported by 2 x 4
or 2 x 2 runners on all sides.
flush with the bottom edge of the cutout.