GE PSC23PSWSS Owners Manual - Page 31
REPLACE THE BASE GRILLE, SET THE CONTROLS, START THE ICEMAKER, automatically. It will take 2-3 days
UPC - 084691150329
View all GE PSC23PSWSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 31 highlights
Installation Instructions 7 REPLACE THE BASE GRILLE Replace the grille by installing the two Phillips head screws. 9 START THE ICEMAKER Set the icemaker power switch to the I (on) position. The icemaker will not begin to operate until it reaches its operating temperature of 15°F (-9°C) or below. It will then begin operation automatically. It will take 2-3 days to fill the ice bin. 8 SET THE CONTROLS Set the controls to the recommended setting. Power switch NOTE: In lower water pressure conditions, the water valve may turn on up to 3 times to deliver enough water to the icemaker. 31
31
Installation Instructions
REPLACE THE BASE GRILLE
Replace the grille by installing the two
Phillips head screws.
7
SET THE CONTROLS
Set the controls to the recommended
setting.
8
START THE ICEMAKER
Set the icemaker power switch to the
I (on)
position. The icemaker will not
begin to operate until it reaches its
operating temperature of 15°F (–9°C)
or below. It will then begin operation
automatically. It will take 2–3 days to
fill the ice bin.
NOTE:
In lower water pressure conditions, the
water valve may turn on up to 3 times
to deliver enough water to the icemaker.
9
Power
switch