Haier AD122ALEAA User Manual - Page 15
ÞÎÌʴϲÉÅÄ, ÁÁµ
View all Haier AD122ALEAA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
Installation Manual For Indoor Unit After selecting the unit installation location, proceed the following steps: 1. Drill a hole in the wall and insert the connecting pipe and wire through a PVC wall-through tube purchased locally. The wall hole shall be with a outward down slope of at least 1/100. (See Figure 2) 2. Before drilling check that there is no pipe or reinforcing bar just behind the drilling position. Drilling shall avoid at positions with electric wire or pipe. 3. Mount the unit on a strong and horizontal building roof. If the base is not firm, it will cause noise, vibration or leakage. 4. Support the unit firmly. 5. Change the form of the connection pipe, connection wire and drain pipe so that they can go through the wall hole easily. Unit model For series 122 Fig 2 a b c d e f 538 483.5 131 610 255 105 g h i 418 508 220 For series 182 242 1002 483.5 131 1105 255 105 880 970 220 b fe a gh dc i 14