Purging method: to use vacuum pump

Page 12 highlights

Purging method: to use vacuum pump 1 .Detach the service portis cap of 3-way valve, the valve rod's cap for 2-way valve and 3-way valves, connect the service port into the projection of charge hose (low) for gaugemanifold. Then connect the projection of charge hose (center) for gaugemanifold into vacuum pump. 2 way valve 3 way valve Liquid stop valve Gas stop valve Gauge maifold(R410A) Vacuum pump(R410A) 2 .Open the handle at low in gaugemanifold, operate vacuum pump. If the scale-moves of gause (low) reach Open vacuum condition in a moment, check 1 again. 3 .Vacuumize for over 15min. And check the level gauge which should read -0.1MPa (-76 cm Hg) at low pressure side. After the completion of vacuumizing, close the handle 'Lo' in the vacuum pump. Check the condition of the scale and hold it for 1-2min. If the scale-moves back in spite of tightening, make flaring work again, then return to the beginning of 3 . 4 .Open the valve rod for the 2-way valve to and an angle of anticlockwise 90 degree. After 6 seconds, close the 2way valve and make the inspection of gas leakge. 5 .No gas leakage? In case of gas leakage, tighten parts of pipe connection. If leakage stops, then proceed 6 steps. 6 .Detach the charge hose from the service port, open 2way valve and 3-way. Turn the valve rod anticlockwise until hitting lightly. 7 .To prevent the gas leakage, turn the service ports cap, the valve rodis cap for 2-way valve and 3-way's a little more than the point where the torque increases suddenly. CAUTION: If the refrigerant of the air conditioner leaks, it is necessary to make all the refrigerant out. Vacuumize first, then charge the liquid refrigerant into air conditioner according to the amount marked on the name plate. 10 Close 2 way valve 900 3 way valve Service port 900 for 6 sec. If it does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder. 2 way valve 6 3 way valve 6 2 way valve 3 way valve Valve rod cap Valve rod cap Service port cap 2 way valve 3 way valve 2 way valve 3 way valve 2 way valve 90o 10s 3 way valve 6.35mm To indoor unit A (1/4") 9.52mm (3/8") 6.35mm To indoor unit B (1/4") 9.52mm (3/8") 6.35mm To indoor unit C (1/4") 9.52mm (3/8")

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18

10
In case of gas leakage, tighten
parts of pipe connection. If
leakage stops, then proceed
6
steps.
Purging method: to use vacuum pump
2 way valve
3 way valve
90
0
Service port
90
0
for 6 sec.
6 .Detach the charge hose from the service port, open 2-
way valve and 3-way. Turn the valve rod anticlockwise
until hitting lightly.
Liquid stop valve
2 way valve
3 way valve
Gas stop valve
Gauge maifold(R410A)
Vacuum pump(R410A)
Open
Close
2 way valve
3 way valve
6
6
2 way valve
3 way valve
Valve rod cap
Valve rod cap
Service port cap
2 way valve
3 way valve
90
o
10s
6.35mm
(1/4")
To indoor unit A
6.35mm
(1/4")
2 way valve
3 way valve
2 way valve
3 way valve
9.52mm
(3/8")
9.52mm
(3/8")
6.35mm
(1/4")
9.52mm
(3/8")
1 .Detach the service portis cap of 3-way valve,
the valve
rod's cap for 2-way valve and 3-way valves, connect the
service port into the projection of charge hose (low) for
gaugemanifold. Then connect the projection of charge
hose (center) for gaugemanifold into vacuum pump.
2 .Open the handle at low in gaugemanifold, operate
vacuum pump. If the scale-moves of gause (low) reach
vacuum condition in a moment, check 1 again.
3 .Vacuumize for over 15min. And check the level gauge
which should read -0.1MPa (-76 cm Hg) at low pressure
side. After the completion of vacuumizing, close the
handle 'Lo' in the vacuum pump. Check the condition of
the scale and hold it for 1-2min. If the scale-moves back
in spite of tightening, make flaring work again, then
return to the beginning of
3
.
4 .Open the valve rod for the 2-way valve to and an angle
of anticlockwise 90
degree. After 6 seconds, close the 2-
way valve and make the inspection of gas leakge.
5 .No gas leakage?
If it does not stop gas leakage, discharge
whole refrigerants from the service port.
After flaring
work again and vacuumize,
fill up prescribed refrigerant from the gas
cylinder.
7 .To prevent the gas leakage, turn the service ports cap,
the valve rodis cap for 2-way valve and 3-way's a little
more than the point where the torque increases suddenly.
To indoor unit B
To indoor unit C
CAUTION:
If the refrigerant of the air conditioner leaks, it is necessary
to make all the refrigerant out. Vacuumize first, then charge
the liquid refrigerant into air conditioner according to the