Haier CPN11XCJ Installation Manual - Page 7

Outdoor unit

Page 7 highlights

Outdoor unit 5.Purging Method: Push the air out of the indoor unit and piping as followes: (1) Remove the valve cap on 2-way valve in outdoor unit. (2) Loosen by 1/2 turn the flare nut of gas pipe, which is conneted to 3-way valve. (3) Loosen 2-way valve by 90o using hexagon wrench, and after approx. 10 sec tighten it up. Gas comes out through flare nut on wide pipe. If no gas is discharged, tighten flare nut with specified torque. (4) Open 2-way and 3-way valves using specified torque. (5) Tighten the caps on the valves with specified torque. 2-way valve 3-way valve 6.35mm(1/4") 12.7mm(1/2") HSU-18LEA03(T3) HSU-18LEA13(T3) Tighten torque N.m Valve rod 7-9 Valve cap 20-25 When connecting pipe exceeds 5 meters, 20g refrigerant shall be added per exceeding meter. Charge according to the following list. Piping length 5m 7m Additional amount No need 40 g 10m 100g Note: When extending piping, air inside piping shall be removed by using external refrigerant gas, charge according to the following list. Brand new outdoor unit is charged 50g more refrigerant than regulated weight. Only for first installation, this extra 50g can be used to purge air in pipes. During this procedure, 50g refrigerant will be discharged in piping. (This must be strictly controlled within 90o and 10 sec.) 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8

Outdoor unit
5.Purging Method:
7
Push the air out of the indoor unit
and piping as followes:
(1) Remove the valve cap on 2-way
valve in outdoor unit.
(2) Loosen by 1/2 turn the flare nut of
gas pipe, which is conneted to
3-way valve.
(3) Loosen 2-way valve by 90
o
using
hexagon wrench, and after approx.
10 sec tighten it up. Gas comes out
through flare nut on wide pipe. If no
gas is discharged, tighten flare nut
with specified torque.
(4) Open 2-way and 3-way valves
using specified torque.
(5) Tighten the caps on the valves
with specified torque.
Valve rod
Valve cap
7-9
20-25
Tighten torque N.m
When connecting pipe exceeds 5 meters,
20
g refrigerant shall be added
per exceeding meter. Charge according to the following list.
Piping length
Additional amount
5m
7m
No need
40
g
During this procedure, 50g refrigerant will be discharged in piping.
(This must be strictly controlled within 90
o
and 10 sec.)
Brand new outdoor unit is charged 50g more refrigerant than regulated
weight. Only for first installation, this extra 50g can be used to purge air
in pipes.
Note: When extending piping, air inside piping shall be removed by using external
refrigerant gas, charge according to the following list.
10m
100
g
3-way valve
2-way valve
6.35mm(1/4")
12.7mm(1/2")
HSU-18LEA03(T3)
HSU-18LEA13(T3)