Haier HBU-14HC03 User Manual - Page 27
Installation Procedudres
View all Haier HBU-14HC03 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 27 highlights
Installation Procedudres 1.Selection of Installation Place (1) Place above the ceiling where have enough space to arrange the unit. (2) Place where the drainage pipe can be arranged well. (3) Place where inlet and outlet air of indoor and outdoor unit will not be blocked. (4) Do not expose the unit to the place with heavy oil or moisture (e.g.kitchen and workshop). (5) Do not set the unit in the place where destructive gas (such as sulfuric acid gas) or pungent gas (thinner and gasoline) concentrates and retains. (6) Place strong enough to support the unit weight. (7) No expensive articles such as television and piano below indoor unit. (8) Enough space for maintenance. (9) Place more than 1m away from television and radio to avoid disturbing television and radio. (10) Easy for maintenance. H 0.31m 1.5m Air outlet Air inlet Air outlet 2.5m Over 1.5m 2.Installation Preparation (1) Position of ceiling opening between unit and suspending bolt (front view of unit). Ornament panel 630mm ceiling opening 600mm Indoor unit 570mm Overlap between ceiling and ornament panel shall be 15mm Suspending bolts m012 m53 m53 Distance between suspending bolts 460mm Indoor unit 570mm Ceiling opening 600mm Ornament panel 630mm Ceiling Ornament panel (2) Prepare all piping (refrigerant,water drainage )and wires (connection wire of remote controller, indoor unit connection wires) to the indoor unit before installation in order to connect indoor unit immediately after installation. 25