HP Cisco MDS 9020 Cisco MDS 9100 Series Hardware Installation Guide (OL-17951- - Page 102
Task No., Planning Activity, Verified By, Table D-1, Site Planning Checklist
View all HP Cisco MDS 9020 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 102 highlights
Site Preparation Checklist Appendix D Site Planning and Maintenance Records Send documentation comments to [email protected] Table D-1 Site Planning Checklist Task No. Planning Activity Verified By 1 Space evaluation: • Space and layout • Floor covering • Impact and vibration • Lighting • Maintenance access 2 Environmental evaluation: • Ambient temperature • Humidity • Altitude • Atmospheric contamination • Air flow 3 Power evaluation: • Input power type • Power receptacles1 • Receptacle proximity to the equipment • Dedicated circuit for power supply • Dedicated (separate) circuits for redundant power supplies • UPS2 for power failures 4 Grounding evaluation: • Circuit breaker size • CO ground (AC- powered systems) 5 Cable and interface equipment evaluation: • Cable type • Connector type • Cable distance limitations • Interface equipment (transceivers) 6 Electromagnetic interference (EMI) evaluation: • Distance limitations for signaling • Site wiring • RFI3 levels 1. Verify that the power supply installed in the chassis has a dedicated AC source circuit. 2. UPS = uninterruptible power supply. 3. RFI = radio frequency interference. Time Date Cisco MDS 9100 Series Hardware Installation Guide D-2 OL-17951-02