HP Cluster Platform Hardware Kits v2010 HP DL1000 Cable Management Kit Install - Page 6

Preparing for Installation, 1.1 Audience, 1.2 Documentation Resources, 1.3 Kit Description

Page 6 highlights

1 Preparing for Installation 1.1 Audience This guide is intended for HP service representatives and other persons trained to install hardware options in HP 10000 series racks. Such persons are expected to understand the hazards of working in this environment and to take suitable precautions to minimize danger to themselves and others. 1.2 Documentation Resources You can download the documentation for components referenced in this installation guide from the following locations: • HP 10000 Series Rack (Documentation option): http://h18004.www1.hp.com/products/servers/proliantstorage/racks • HP Cluster Platform: http://docs.hp.com/en/highperfcomp.html 1.3 Kit Description The HP DL1000 series cable management kit described in this manual is designed to align and support the InfiniBand cables that lead from the server to another InfiniBand switch in the rack or to an adjacent rack. The kit provides strain relief for the cables connected to the individual InfiniBand connector ports and ensures a good connection. It also ensures the correct bend radius for the InfiniBand cable and provides channels for cable routing and cable management. One cable management kit is required for each HP ProLiant DL4x170h G6 server. NOTE: The cable management kit is designed to support 24 AWG (0.41 inch) diameter, 26 AWG (0.37 inch) diameter, and 28 AWG (0.33 inch) diameter InfiniBand cables. Consult the documentation supplied with your cluster before installing the brackets and routing the cables. 1.4 Kit Contents Verify that the cable management bracket kit contains the following components: • Packaging and documentation. • Four 3.5-inch Velcro straps • The bracket hardware shown in Figure 1-1. 6 Preparing for Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

1 Preparing for Installation
1.1 Audience
This guide is intended for HP service representatives and other persons trained to install hardware
options in HP 10000 series racks. Such persons are expected to understand the hazards of working
in this environment and to take suitable precautions to minimize danger to themselves and
others.
1.2 Documentation Resources
You can download the documentation for components referenced in this installation guide from
the following locations:
HP 10000 Series Rack (
Documentation
option):
ers/proliantstorage/racks
HP Cluster Platform:
1.3 Kit Description
The HP DL1000 series cable management kit described in this manual is designed to align and
support the InfiniBand cables that lead from the server to another InfiniBand switch in the rack
or to an adjacent rack. The kit provides strain relief for the cables connected to the individual
InfiniBand connector ports and ensures a good connection. It also ensures the correct bend radius
for the InfiniBand cable and provides channels for cable routing and cable management. One
cable management kit is required for each HP ProLiant DL4x170h G6 server.
NOTE:
The cable management kit is designed to support 24 AWG (0.41 inch) diameter, 26 AWG
(0.37 inch) diameter, and 28 AWG (0.33 inch) diameter InfiniBand cables. Consult the
documentation supplied with your cluster before installing the brackets and routing the cables.
1.4 Kit Contents
Verify that the cable management bracket kit contains the following components:
Packaging and documentation.
Four 3.5-inch Velcro straps
The bracket hardware shown in
Figure 1-1
.
6
Preparing for Installation