HP Cluster Platform Hardware Kits v2010 HP DL1000 Cable Management Kit Install - Page 9
Installing the Cable Management Kit, 2 Securing the InfiniBand Cables
View all HP Cluster Platform Hardware Kits v2010 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
2 Installing the Cable Management Kit The location of the cable management kit depends on the rack position occupied by the server chassis. Align each bracket with the InfiniBand connector ports on the server so that the bracket's mounting flange is level with the InfiniBand ports. 2.1 Installing the Cable Management Kit To install the cable management kit, follow these steps: 1. Identify and mark the two holes in the rack's rear mounting rails (callouts 1 and 3 in Figure 2-1) and clip the 10-32 cage nuts (callout 4 in Figure 2-1) into the square holes. 2. Fasten the top and bottom brackets (callouts 2 and 6 in Figure 2-1) using the four 10-32 screws (callout 5 in Figure 2-1). Figure 2-1 Installing the Cable Management Brackets 1 3 2 4 6 5 2.2 Securing the InfiniBand Cables After installing the cable management brackets (callouts 1 and 2 in Figure 2-2) you must install the Infiniband cables. Once the InfiniBand cables (callout 3 in Figure 2-2) are installed, you can secure them to the cable management brackets using the 3.5-inch Velcro straps (see detailed view in Figure 2-2). 2.1 Installing the Cable Management Kit 9