2 Checklist Address information Company name Street address City Country Postal code Telephone Fax E-mail Contact persons Company engineer or technician System administrator Operators to be trained on printer use and maintenance Name Telephone Email General access & equipment unloading Yes No Is there an easily accessible unloading area, with sufficient space to unload and maneuver the equipment? Has the route to the installation area been checked to meet all requirements (height, width, and clearance of ceilings, doorways, and corridors) and is the conveyance route clear? Is a power outlet available near the site where you plan to disassemble the crate (for the electric screwdriver used to disassemble the crate)? Have specialist movers been contracted to unload and move the equipment on the date required? Are the specialist movers aware of the specifications provided in this document? Are there one or more suitable forklifts contracted for installation? Are there skates available to help position the crate? Is there a pallet jack available to help position the crate? Will you install the printer on a second level or higher? If so, is there a suitable crane contracted for installation? Are the appropriate crane attachments available? Will the operator be available for the installation training which lasts two full working days? Comments 2 Chapter 2 Checklist ENWW

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

2
Checklist
Address information
Company name
Postal code
Street address
Telephone
City
Fax
Country
E-mail
Contact persons
Name
Telephone
Email
Company engineer or technician
System administrator
Operators to be trained on printer use and
maintenance
General access & equipment unloading
Yes
No
Comments
Is there an easily accessible unloading area, with sufficient space to unload
and maneuver the equipment?
Has the route to the installation area been checked to meet all requirements
(height, width, and clearance of ceilings, doorways, and corridors) and is the
conveyance route clear?
Is a power outlet available near the site where you plan to disassemble the
crate (for the electric screwdriver used to disassemble the crate)?
Have specialist movers been contracted to unload and move the equipment
on the date required?
Are the specialist movers aware of the specifications provided in this
document?
Are there one or more suitable forklifts contracted for installation?
Are there skates available to help position the crate?
Is there a pallet jack available to help position the crate?
Will you install the printer on a second level or higher? If so, is there a suitable
crane contracted for installation? Are the appropriate crane attachments
available?
Will the operator be available for the installation training which lasts two full
working days?