HP Designjet L65500 HP Designjet L65500 Printer Series - Site Preparation Chec - Page 5

Is the Power Distribution Unit PDU correctly installed? - supplies

Page 5 highlights

Room layout and flooring Yes No Is there sufficient space around the equipment? Has all room construction and painting been completed? Does the floor load-bearing capacity meet the specifications in this guide? Does the floor surface meet the specifications in this guide? If special reinforcements are necessary, are they completed? Comments Safety requirements Yes No Is there an emergency exit in the print production area, with easy access and free from any obstruction? Have the two fire extinguishers been fitted in the prescribed locations in the print production and storage areas? Is the print production fire extinguisher rated for electrical fire? Have strategic locations been allocated for the fixture and display of the appropriate safety warning signs? Comments Electrical installation Yes No Comments Has the tri-phase branch circuit breaker (3 poles, 40 A) been correctly installed? Has the tri-phase residual current circuit breaker (also known as GFI) (3 poles, 30 mA residual, 40 A capacity) been correctly installed? Has the single-phase branch circuit breaker (2 poles, 20 A) been correctly installed? Has the single-phase residual current circuit breaker (also known as GFI) (2 poles, 30 mA residual, 20 A capacity) been correctly installed? Would residual current circuit breakers operate in case of a current leakage fault to the product chassis (even if an isolation device is installed)? (Required) (Required) (Required) Is the grounding conductor properly installed? (Required) Have you booked the services of an electrician for the day of installation? (Required) Is the electrician aware of all requirements and specifications highlighted in this document? (Required) Is the Power Distribution Unit (PDU) correctly installed? (Required) Is the tri-phase line voltage inside the specified voltage range: 200-220 V~ (±10%) or 380-415 V~ (-10%, +6%)? Is the single-phase line voltage inside the specified voltage range: 115-127 V~ (±10%) or 200-240 V~ (-10%, +6%)? Specify nominal mains voltage: Specify nominal mains voltage: Electrical configuration Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly installed? Yes No Comments ENWW 3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

Room layout and flooring
Yes
No
Comments
Is there sufficient space around the equipment?
Has all room construction and painting been completed?
Does the floor load-bearing capacity meet the specifications in this guide?
Does the floor surface meet the specifications in this guide? If special
reinforcements are necessary, are they completed?
Safety requirements
Yes
No
Comments
Is there an emergency exit in the print production area, with easy access and
free from any obstruction?
Have the two fire extinguishers been fitted in the prescribed locations in the
print production and storage areas? Is the print production fire extinguisher
rated for electrical fire?
Have strategic locations been allocated for the fixture and display of the
appropriate safety warning signs?
Electrical installation
Yes
No
Comments
Has the tri-phase branch circuit breaker (3 poles, 40 A) been correctly
installed?
(Required)
Has the tri-phase residual current circuit breaker (also known as GFI) (3
poles, 30 mA residual, 40 A capacity) been correctly installed?
Has the single-phase branch circuit breaker (2 poles, 20 A) been correctly
installed?
(Required)
Has the single-phase residual current circuit breaker (also known as GFI) (2
poles, 30 mA residual, 20 A capacity) been correctly installed?
Would residual current circuit breakers operate in case of a current leakage
fault to the product chassis (even if an isolation device is installed)?
(Required)
Is the grounding conductor properly installed?
(Required)
Have you booked the services of an electrician for the day of installation?
(Required)
Is the electrician aware of all requirements and specifications highlighted in
this document?
(Required)
Is the Power Distribution Unit (PDU) correctly installed?
(Required)
Is the tri-phase line voltage inside the specified voltage range: 200–220 V~
(±10%) or 380–415 V~ (–10%, +6%)?
Specify nominal mains voltage:
Is the single-phase line voltage inside the specified voltage range: 115–127
V~ (±10%) or 200–240 V~ (–10%, +6%)?
Specify nominal mains voltage:
Electrical configuration
Yes
No
Comments
Do you need an Uninterrupted Power Supply (UPS)? If so, is it correctly
installed?
ENWW