HP LH4r HP Netserver LH 6000 Rack Cabling Guide - Page 17
Follow the power up sequence. See Power Up Sequence
View all HP LH4r manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
Chapter 1 Preparation for Cabling the HP NetServer LH 6000r Managing and Routing Cables • Route cables through the Cable Management Arm and tie-wrap them in place. • Route cables through Cable Guide and tie wrap them in place. Powering Up and Powering Down the Components in the Rack • Follow the power up sequence. See "Power Up Sequence" in Chapter 3. • If it becomes necessary to bring the server power down, follow the "Power Down Considerations" in Chapter 3. 11. Configure the System, Install Doors and Side Panels At this point, refer to the NetServer user or installation manual and configure the system. Install front and rear doors as required, and mount side panels. Look for detailed instructions and illustrations with the rack enclosure and components. 13