HP LH6000r HP Netserver LH 3000 Rack Cabling Guide - Page 8
Site Preparation -- Circuit Breakers
![]() |
View all HP LH6000r manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
Chapter 1 Preparation for Cabling the HP NetServer LH 3000r Table 1-1. Site Preparation Checklist (Continued) Environment and Space Requirements Must meet OSHA, local code, and HP specifications for safety and supportability (3 feet minimum access in front and rear of electrical cabinets) Side access of 24 inches improves cable routing and management Optimal: 24 hour air conditioning (68 - 72 deg. F; 20 - 22 deg. C, 40 - 60% RH) Minimum: Maintain temperature inside NetServer enclosure between 41 and 95 deg. F, 5 - 35 deg. C Enough table or work space for console terminal and user guides Bookshelf for documentation Area to store equipment until time of installation Ensure all equipment and/or shipping pallets can fit through doorways, hallways, and into and out of elevators Data & Voice Communications (Pre-Tested and Verified) Voice phone located at system console terminal with cord long enough to reach all parts of the rack installation Phone line for remote support at each system Ethernet, FDDI, Token Ring, or other network connection standard System Parameters Hostname IP address Subnet Mask Gateway IP Address Gateway Host Name DTC Node Name Hardware Configuration, Cables, and Additions Availability of I/O paths and SCSI addresses for add-on devices Availability of I/O backplane slots, memory slots, etc. Valid, supportable configuration for added devices, interfaces, memory, etc. Correct type and length of cables, as specified in order documents Site Preparation -- Circuit Breakers When you connect the HP NetServer LH 3000r to an AC power source, the server temporarily draws a large "inrush current." This occurs even when the system is in 4
![](/manual_guide/products/hewlettpackard-lh3000r-hp-netserver-lh-3000-rack-cabling-guide-52ab102/8.png)