HP ML150 ISS Technology Update, Volume 7, Number 8 - Page 6

ISS Technology Update, Volume 7, Number 8, Power cycle the server, Additional resources

Page 6 highlights

ISS Technology Update status=0 status_tag=COMMAND COMPLETED Server power off. hpiLO-> Volume 7, Number 8 Power cycle the server The "reset system1" command, as shown below, performs a reset by power cycling the server, regardless of the OS state. C:\putty>plink -ssh -l admin -pw password ilo2system.corp.net reset system1 reset system1 status=0 status_tag=COMMAND COMPLETED Resetting server. hpiLO-> Additional resources For additional information on the topics discussed in this article, visit: Resource HP Integrated Lights-Out DMTF SMASH information PuTTY and Plink URL www.hp.com/go/ilo www.dmtf.org/standards/mgmt/smash/ www.google.com/search?q=PuTTY 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

ISS Technology Update
Volume 7, Number 8
6
status=0
status_tag=COMMAND COMPLETED
Server power off.
</>hpiLO->
Power cycle the server
The "
reset system1
" command, as shown below, performs a reset by power cycling the server, regardless of the OS state.
C:\putty>plink -ssh -l admin -pw password ilo2system.corp.net reset system1
reset system1
status=0
status_tag=COMMAND COMPLETED
Resetting server.
</>hpiLO->
Additional resources
For additional information on the topics discussed in this article, visit:
Resource
URL
HP Integrated Lights-Out
www.hp.com/go/ilo
DMTF SMASH information
www.dmtf.org/standards/mgmt/smash/
PuTTY and Plink
www.google.com/search?q=PuTTY