HP ProLiant BL25p HP ProLiant BL25p Generation 2 Server Blade User Guide - Page 21
Completing the configuration
View all HP ProLiant BL25p manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
3. Install the server blade. When the server blade is fully inserted, it locks into place. The default setting for server blades initiates automatic power up. CAUTION: To prevent improper cooling and thermal damage, do not operate the server blade enclosure unless all bays are populated with either a component or a blank. NOTE: The first server blade must be installed into a server blade enclosure to facilitate naming the server blade enclosure, the rack, and the interconnects. Complete the system configuration before installing additional server blades. Completing the configuration To complete the server blade and HP BladeSystem configuration, refer to the hardware installation and configuration poster that ships with the server blade enclosure. Setup 21