HP Xw460c BladeSystem c-Class Solution Overview Setup Poster - Page 4

B. Install the components, C. Connect the Onboard Administrator module, cabling, D. Install - review

Page 4 highlights

B. Install the components Before installing front or rear components into the enclosure, review enclosure bay numbering for each component. Install any options, such as processor, memory, mezzanine card, or hard drive, into each blade. Based on the total number ordered and the planned configuration, install the following components: • Blades • Onboard Administrator modules • Power supplies • Active cool fans For installation instructions, see the appropriate enclosure setup and installation guide. C. Connect the Onboard Administrator module cabling Use the appropriate cables to connect each installed Onboard Administrator module to the external connections. The connectors on the Onboard Administrator module provide a connection to the iLO management network and the capability to link multiple enclosures. IMPORTANT: For proper management of enclosure devices there must be an Ethernet connection from the Onboard Administrator module to the external management network. For information on Onboard Administrator module cabling, see the HP BladeSystem Onboard Administrator User Guide. D. Install the interconnect modules and connect cabling Install the interconnects based on the type of fabric in the configuration and the planned installation location of each mezzanine card. Use the appropriate cables to connect each installed interconnect module to the network. E. Power up the enclosure Connect the AC or DC power cables, depending on the power configuration. When the circuit breakers are powered, the enclosure and HP BladeSystem Insight Display have power. By default, each installed component also powers up. Examine the HP BladeSystem Insight Display for any errors which may prevent installed components from powering up.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8

B. Install the components
Before installing front or rear components into the enclosure, review enclosure bay
numbering for each component.
Install any options, such as processor, memory, mezzanine card, or hard drive,
into each blade.
Based on the total number ordered and the planned configuration, install the
following components:
Blades
Onboard Administrator modules
Power supplies
Active cool fans
For installation instructions, see the appropriate enclosure setup and installation
guide.
C. Connect the Onboard Administrator module
cabling
Use the appropriate cables to connect each installed Onboard Administrator
module to the external connections. The connectors on the Onboard Administrator
module provide a connection to the iLO management network and the capability
to link multiple enclosures.
IMPORTANT:
For proper management of enclosure devices
there must be an Ethernet connection from the Onboard
Administrator module to the external management network.
For information on Onboard Administrator module cabling,
see the
HP BladeSystem Onboard Administrator User
Guide
.
D. Install the interconnect modules and connect
cabling
Install the interconnects based on the type of fabric in the configuration and the
planned installation location of each mezzanine card. Use the appropriate cables
to connect each installed interconnect module to the network.
E. Power up the enclosure
Connect the AC or DC power cables, depending on the power configuration.
When the circuit breakers are powered, the enclosure and HP BladeSystem Insight
Display have power. By default, each installed component also powers up.
Examine the HP BladeSystem Insight Display for any errors which may prevent
installed components from powering up.