HP rp7400 Site Preprepation - rp7400 - Page 39
Members of the Site Planning Team should include the Site Coordinator
View all HP rp7400 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 39 highlights
• Coordinating construction efforts • Primary liaison with Hewlett-Packard representatives Principal Operator The Principal Operator is responsible for the following tasks: • System operation • Monitoring site preparation • Ordering computer supplies • Scheduling user training • Maintaining maintenance schedules Site Planning Team The Site Planning Team is responsible for the following tasks: • Determining site location and size • Reviewing construction requirements • Reviewing local codes • Reviewing insurance requirements • Scheduling all events related to site completion Members of the Site Planning Team should include the Site Coordinator, Principal Operator, and the Hewlett-Packard Site Preparation Specialist. When possible, the electrical contractor, a site construction coordinator (familiar with local electrical codes), and an air conditioning specialist should be included. 39