INSTALLATION INSTRUCTIONS PZ 60 inch Side Discharge Deck Kit - 966555302 Tools Required • ½" socket or wrench (battery terminals, strut shaft). • ½" breaker bar with 2-3" extension (relieve tension on idler arms). Refer to Operators Manual when needed. WARNING! The deck lift system on the chassis has springs that assist in lifting the deck. Leave the deck lift in the transport position when installing the deck. Failure to follow these instructions could result in injury. PZ Cutting Deck Installation 1. Disconnect negative cable from battery on the chassis. 2. If installing the deck on a diesel unit, remove the belt from the deck assembly and use the belt included with the chassis. 3. Make sure the deck is latched in the transport position (furthest forward position). 4. Slide the deck under the chassis. 5. Block the deck up with boards, pallet, or pallet jack, so the deck lift chains line up with the brackets on the deck. 8. Slide the strut pins* through the deck brackets and cast struts on each side. 9. Secure the strut pins to the deck on each side with 5/16" carriage bolts * and nuts *. 10. Remove the block from under the deck. 11. Lower the deck to the 3" cutting height. 12. Remove deck belt shields. *Supplied in the hardware bag included with the chassis 6. Using the 7/16 clevis pins* and E-rings*, connect all four chains to the deck. 7. Line up the cast struts on the chassis with the u- brackets on the deck. a. Cast strut b. Carriage bolt, 5/16-18 x 1 c. Strut pin d. Nut, 5/16-18, nyloc e. Clevis pin, 7/16" f. E-ring,7/16" g. Lift chain 8058-121 g f e P/N 575 661201R1 02/22/10 a bc d

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8

P/N 575 661201R1
02/22/10
INSTALLATION INSTRUCTIONS
PZ 60 inch Side Discharge Deck Kit - 966555302
Tools Required
½" socket or wrench (battery terminals, strut
shaft).
½" breaker bar with 2-3" extension (relieve tension
on idler arms).
WARNING!
The deck lift system on the chassis
has springs that assist in lifting
the deck. Leave the deck lift in the
transport position when installing
the deck. Failure to follow these
instructions could result in injury.
Refer to Operators Manual when needed.
PZ Cutting Deck Installation
Disconnect negative cable from battery on the
1.
chassis.
If installing the deck on a diesel unit, remove the
2.
belt from the deck assembly and use the belt
included with the chassis.
Make sure the deck is latched in the transport
3.
position (furthest forward position).
Slide the deck under the chassis.
4.
Block the deck up with boards, pallet, or pallet
5.
jack, so the deck lift chains line up with the
brackets on the deck.
Using the
6.
7
/
16
clevis pins* and E-rings*, connect all
four chains to the deck.
Line up the cast struts on the chassis with the
7.
u- brackets on the deck.
Cast strut
a.
Carriage bolt,
b.
5
/
16
-18 x 1
Strut pin
c.
Nut,
d.
5
/
16
-18, nyloc
Clevis pin,
e.
7
/
16
"
E-ring,
f.
7
/
16
"
Lift chain
g.
a
b
c
d
e
g
f
Slide the strut pins* through the deck brackets
8.
and cast struts on each side.
Secure the strut pins to the deck on each side
9.
with
5
/
16
" carriage bolts * and nuts *.
Remove the block from under the deck.
10.
Lower the deck to the 3" cutting height.
11.
Remove deck belt shields.
12.
*Supplied in the hardware bag included with the
chassis
8058-121